My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: PH on Ordinance Amending Metro Plan (Delta Sand and Gravel)
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 11/01/06 JEO Meeting
>
Item 1: PH on Ordinance Amending Metro Plan (Delta Sand and Gravel)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:18:50 PM
Creation date
10/26/2006 8:42:07 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Staff Memo
CMO_Meeting_Date
11/1/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />19. Comply with the Fugitive Dust Control Program, required by LRAPA permit <br />no.20119 for the expansion area, which will be added to the permit. <br /> <br />20. Conduct mining in phases to minimize the size of the disturbed area at any one <br />time. <br /> <br />21. Vegetate mined areas to reclaim the land and minimize erosion and dust <br />generation except where open water features exist in the reclamation plan. <br /> <br /> <br />GROUNDWATER <br /> <br />Condition proposed by the applicant: <br />22. Construct a low-permeability barrier in advance of proceeding with excavation in <br />the expansion area consistent with the recommendations of EGR. <br /> <br /> <br />Existing Conditions in the Current DOGAMI Operating Permit (file record No. 17): <br /> <br />The permittee shall: <br />1. be sure all water leaving this operation complies with DEQ’s effluent quality <br />requirements. <br /> <br />2. maintain the dike between the site and the Willamette River so that the river does <br />not erode into the pit. <br /> <br />3. construct perimeter roads on Confluence Island in a manner that they are <br />armored against erosion. <br /> <br />4. follow the reclamation and operating plan labeled site 20-0131 for reclamation on <br />Confluence Island. <br /> <br />5. comply with DEQ requirements regarding the backfilling activities in the main <br />Delta Pit. <br /> <br />6. respread a minimum of 12 inches of topsoil over all reclaimed areas. <br /> <br />7. create fill slopes not to exceed 2H:1V, excavated slopes not exceeding 1.5H:1V, <br />and pond slopes not to exceed 3H:1V to 6 feet below the low water level. <br /> <br />8. submit a Plan for Mining to the Sand and Gravel Review Committee for review of <br />criteria in Lane Code 16.217 for review and approval. <br /> <br />9. obtain any necessary permits from regulatory agencies with hydrologic <br />responsibility for plan approval. <br />Ordinance No. PA 1238 – Exhibit C Conditions Delta Sand & Gravel <br />Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.