Laserfiche WebLink
EugeneOrdinanceExhibitA1 <br />\[LaneCountyOrdinanceExhibitA1\] <br /> <br />P-Q <br /> <br />Q-R <br /> <br />R-S <br /> <br />S-T <br /> <br />T-U <br /> <br />U-V <br /> <br />V-W <br /> <br />W-X <br /> <br />X-Y <br /> <br />Y-Z <br /> <br />Z-A <br />12 <br /> UGB segments C-P are now specifically identified on the table entitled “List of tax lots which are adjacent to and <br />inside, or split by the UGB” and the document entitled “Summary of Methodology Utilized to Refine the Location <br />of the Springfield Urban Growth Boundary.” The table and methodology document were added to the Metro Plan in <br />2011 as part of the adoption of the City of Springfield’s city-specific UGB (through Springfield Ordinance No. 6268 <br />and Lane County Ordinance No. PA 1274 in 2011.\] <br />G. <br />The heading of Section B in Chapter III of the Metro Plan is amended, a new first <br />paragraph is added with footnotes renumbered as needed, to provide as follows: <br />B. Economic Element <br />(Not Applicable to Eugene) <br />\[The Economic Element of the Metro Plan no longer applies on <br />the west side of Interstate 5. The Envision Eugene <br />Comprehensive Plan sets out the Economic Development policies <br />\[fn\] <br />that apply within the Eugene UGB\] <br />_________________________________________ <br />\[fn\] <br />See the Envision Eugene Comprehensive Plan, originally adopted by Eugene Ordinance No. 20584 <br />and Lane County Ordinance PA 1345. <br />H. <br />Footnotes throughout the Metro Plan are renumbered to be consistent with the <br />amendments made herein. <br /> Page 4 of 4 <br />Eugene Final <br />