Laserfiche WebLink
<br />r-- ~ ')11"..' <br />U f.."tr'i <br /> <br />----- -)['-- .~~-~~- -----'--~~-- ------ ~~----~~~-~ ~-----, <br /> <br /> <br />I Strong & Macdonald, Inc. <br />1 4045 Ruston Way <br />. '",' ! Tacoma, Washington <br /> <br />'.~ ,.,,~ <br /> <br />TOTAL <br /> <br />$22,816.50 <br /> <br />$ 926.64 <br /> <br />$ 534.52 <br /> <br />$ 1,204.28 <br /> <br />$ 6,710.00 <br />$ 150.00 <br />$32,341.94 <br /> <br />'I <br /> <br />wi <br />wi <br />~~ <br />, <br />I <br />I <br />",I <br /> <br />648 <br /> <br />Lin.ft.of~ 6-in.Sewer, laid .cp.m.plete <br />,@1.23 per line ft.' <br />Lin.ft.of 8-in.Sewer, laid complete <br />@ 1.43 per lin.ft. <br />lin.ft.bf 10-in.Sewer, laid complete <br />@ 1.61 per lin.ft. <br />Lin.ft.of 12-in.Sewer, laid complete <br />@ 1.87 per lin.ft. <br />61 Manholes, as per Standard Plans, <br />@ 110.00 per Manhole <br />1 Siphon, as per Plans @ 150.00 <br /> <br />.~"l'.' . <br />,~ <br /> <br />18,550 <br /> <br />332 <br /> <br />644 <br /> <br />The above estimate is for concrete sewer pipe. <br />A check for Two Thousand Dollars ($2000.00), being <br />5% of the amount bid, accompanied the proposal. <br /> <br />Oregon Installation Co. <br />2003 Franklin <br />Eugene, Oregon <br /> <br />18,550 Lin.ft.of 6-in.Sewer, laid complete <br />@ 94 per lin.ft. <br />648 Lin.ft.of 8-in.Sewer, laid complete <br />@ 1.22 per lin.ft. <br />332 Lin. ft. of 10-in. Sewer, la id complete <br />@ 1.43 per lin.ft. <br />644 Lin.ft.of 12-in.Sewer, laid complete <br />@ 1.70 per lin.ft. <br />61 Manholes, as per Standard Plans @ 84.90 <br />per Manhole <br />1 Siphon, as per Plans @ 280.00 <br /> <br />$17,437.00 <br />$ 790.56 <br />$ 474.76 <br />$ 1,128.80 <br />$ 5,178.90 1 <br />$ 280.00 <br />$25,290.02 <br /> <br />TOTAL <br /> <br />The above estimate is for concrete Sewer Pipe. <br />A chec.k for Two Thousand Dollars ($2000.00); being <br />~ of the amount bid, accompanied the proposal. <br /> <br />Oregon Installation Co. <br /> <br />18,550 Lin.ft.of 6-in.Sewer, laid complete <br />@ .99 per lin.ft. <br />648 Lin.ft.of 8-in.Sewer, laid complete <br />@ 1.32 per lin.ft. <br />332 Lin.ft.of 10-in.Sewer, laid complete <br />@ 1.56 per lin.ft. <br />644 Lin.ft.of 12-in.Sewer, laid complete <br />@ 1.82 per lin.ft. <br />61 Manholes, as per Standard Plans <br />1 Siphon as Per Plans <br /> <br />$18,364.50 <br />$ 855.36 <br /> <br />$ 517.92 <br /> <br />TOTAL <br /> <br />~ 1,208.48 <br />$ 5,178.90 <br />.$ 280.00 <br />$26,405.16 <br /> <br />The above estimate is for Clay sewer pipe. <br />A check for Two Thousand Dollars ($2000.00) <br />accompanied the proposal. <br /> <br />H. C. Werner <br />2091 Kincaid St. <br />Eugene, Oregon <br /> <br />18,550 Lin.ft.of 6-in.Sewer, laid complete <br />@ .95 per lin.ft. <br />648 Lin.ft.of 8-in.Sewer, laid complete <br />@ 1.15 per lin.ft. <br />332 Lin.ft.of 10-in.Sewer, laid complete <br />@1.35 per lin.ft. <br />644 Lin.ft.of 12-in.Sewer, laid complete <br />@ 1.60 per lin.ft. <br />61 Manholes, as per Standard Plans @ 113.00 <br />per Manhole <br />1 Siphon as per Plans @ 175.00 <br /> <br />$17,622.50 <br />$ 745.20 <br />~ 448.20 I <br />11> <br />$ 1,050.40 <br />; 6,893.00 <br /> 175.00 <br /> 26,934.30 <br /> ..~ . <br /> <br />TOTAL <br /> <br />The above estimate is for concrete sewer pipe. <br />A check for Fifteen-Hundred Dollars ($1500.00) <br />being 5% of the amount bid accompanied the proposal. <br /> <br />~ <br />