<br />I Strong & Macdonald, Inc.
<br />1 4045 Ruston Way
<br />. '",' ! Tacoma, Washington
<br />
<br />'.~ ,.,,~
<br />
<br />TOTAL
<br />
<br />$22,816.50
<br />
<br />$ 926.64
<br />
<br />$ 534.52
<br />
<br />$ 1,204.28
<br />
<br />$ 6,710.00
<br />$ 150.00
<br />$32,341.94
<br />
<br />'I
<br />
<br />wi
<br />wi
<br />~~
<br />,
<br />I
<br />I
<br />",I
<br />
<br />648
<br />
<br />Lin.ft.of~ 6-in.Sewer, laid .cp.m.plete
<br />,@1.23 per line ft.'
<br />Lin.ft.of 8-in.Sewer, laid complete
<br />@ 1.43 per lin.ft.
<br />lin.ft.bf 10-in.Sewer, laid complete
<br />@ 1.61 per lin.ft.
<br />Lin.ft.of 12-in.Sewer, laid complete
<br />@ 1.87 per lin.ft.
<br />61 Manholes, as per Standard Plans,
<br />@ 110.00 per Manhole
<br />1 Siphon, as per Plans @ 150.00
<br />
<br />.~"l'.' .
<br />,~
<br />
<br />18,550
<br />
<br />332
<br />
<br />644
<br />
<br />The above estimate is for concrete sewer pipe.
<br />A check for Two Thousand Dollars ($2000.00), being
<br />5% of the amount bid, accompanied the proposal.
<br />
<br />Oregon Installation Co.
<br />2003 Franklin
<br />Eugene, Oregon
<br />
<br />18,550 Lin.ft.of 6-in.Sewer, laid complete
<br />@ 94 per lin.ft.
<br />648 Lin.ft.of 8-in.Sewer, laid complete
<br />@ 1.22 per lin.ft.
<br />332 Lin. ft. of 10-in. Sewer, la id complete
<br />@ 1.43 per lin.ft.
<br />644 Lin.ft.of 12-in.Sewer, laid complete
<br />@ 1.70 per lin.ft.
<br />61 Manholes, as per Standard Plans @ 84.90
<br />per Manhole
<br />1 Siphon, as per Plans @ 280.00
<br />
<br />$17,437.00
<br />$ 790.56
<br />$ 474.76
<br />$ 1,128.80
<br />$ 5,178.90 1
<br />$ 280.00
<br />$25,290.02
<br />
<br />TOTAL
<br />
<br />The above estimate is for concrete Sewer Pipe.
<br />A chec.k for Two Thousand Dollars ($2000.00); being
<br />~ of the amount bid, accompanied the proposal.
<br />
<br />Oregon Installation Co.
<br />
<br />18,550 Lin.ft.of 6-in.Sewer, laid complete
<br />@ .99 per lin.ft.
<br />648 Lin.ft.of 8-in.Sewer, laid complete
<br />@ 1.32 per lin.ft.
<br />332 Lin.ft.of 10-in.Sewer, laid complete
<br />@ 1.56 per lin.ft.
<br />644 Lin.ft.of 12-in.Sewer, laid complete
<br />@ 1.82 per lin.ft.
<br />61 Manholes, as per Standard Plans
<br />1 Siphon as Per Plans
<br />
<br />$18,364.50
<br />$ 855.36
<br />
<br />$ 517.92
<br />
<br />TOTAL
<br />
<br />~ 1,208.48
<br />$ 5,178.90
<br />.$ 280.00
<br />$26,405.16
<br />
<br />The above estimate is for Clay sewer pipe.
<br />A check for Two Thousand Dollars ($2000.00)
<br />accompanied the proposal.
<br />
<br />H. C. Werner
<br />2091 Kincaid St.
<br />Eugene, Oregon
<br />
<br />18,550 Lin.ft.of 6-in.Sewer, laid complete
<br />@ .95 per lin.ft.
<br />648 Lin.ft.of 8-in.Sewer, laid complete
<br />@ 1.15 per lin.ft.
<br />332 Lin.ft.of 10-in.Sewer, laid complete
<br />@1.35 per lin.ft.
<br />644 Lin.ft.of 12-in.Sewer, laid complete
<br />@ 1.60 per lin.ft.
<br />61 Manholes, as per Standard Plans @ 113.00
<br />per Manhole
<br />1 Siphon as per Plans @ 175.00
<br />
<br />$17,622.50
<br />$ 745.20
<br />~ 448.20 I
<br />11>
<br />$ 1,050.40
<br />; 6,893.00
<br /> 175.00
<br /> 26,934.30
<br /> ..~ .
<br />
<br />TOTAL
<br />
<br />The above estimate is for concrete sewer pipe.
<br />A check for Fifteen-Hundred Dollars ($1500.00)
<br />being 5% of the amount bid accompanied the proposal.