<br />A REPORT OF THE CITY MANAGER RE:
<br />AND READ AS FOLLOWS:
<br />
<br />INSPECTION SERVICES FOR WEST SIDE SEWER PROJECT WAS SUBMITTED
<br />
<br />"IN CONNECTION WITH THE CONSTRUCTION OF THE WEST SIDE SEWER SYSTEM INCLUDING THE SEWAGE PUMP-
<br />ING STATION, IT WILL BE NECESSARY FOR THE CITY TO MAINTAIN CGNTINOUS AND COMPETENT ENGINEERING
<br />SUPERVISION OF THE PROJECT. .
<br />
<br />w
<br />~
<br />
<br />I~
<br />
<br />WE WERE ABLE TO ARRANGE A WORK SCHEDULE IN OUR OWN.ENGINEERING DEPARTMENT DURING THE COURSE
<br />OF CONSTRUCTION THE LAST TWO YEARS. THE PRESENT,AND HE~VILY SCHEDULED VOLUME OF WORK IN THE
<br />CITY DURING TH~ SUMMER MONTHS WILL MAKE IT IMPOSSIBLE FOR US TO FURNISH COMPETENT SUPERVISION
<br />OF THE WEST SIDE SEWER PROJECT FROM THE PERSONNEL OF THE ENGINEERING DEPARTMENT.
<br />
<br />~ ,: .
<br />
<br />~.ft~
<br />
<br />I HAVE TAKEN THIS MATTER UP WllH THE CONSULTING ENGINEERS IN CHARGE or THE PROJECT AND THEY
<br />HAVE ADVISED ME THAT COMPETENT ENGINEERING SUPERVISION OF THE ENTIRE PROJECT WOULD BE PROVIDED
<br />FOR A FEE OF 2~% OF THE ACTUAL CONSTRUCTION COSTS. BASED ON BID COSTS FOR THE ENTIRE PROJECT
<br />THIS WOULD REPRESENT A CHARGE OF $6200.00. OWING TO THE FACT THAT THE ENTIRE NEW WEST SIDE
<br />SEWER SYST~M WILL BE A PUMP LINE, I FEEL THAT THE NEED OF CAREFUL AND CONTINOUS ENGINEERING
<br />SUPERVISION AND INSP~CTION CANNOT BE OVER-EMPHASIZED, AND IT HAS BEEN MY OBSERVATION BASED ON
<br />PREVIOUS EXPERIENCE WITH WORK OF THIS KINO, THAT THE COSTS OF PRO~ER AND COMPETENT INSPECTION
<br />WILL MORE THAN BE REPAID IN THE SAVINGS TO BE ACCOMPLISHED DURING THE COURSE OF CONSTRUCTION.
<br />
<br />IT IS HEREBY REQUESTED THAT THE COMMON COUNCIL GRANT AUT<HORITY TO THE CITY MANAGER AT THiS
<br />TIME, TO ENTER INTO A CONTRACT FOR SUPPLYING JOB SUPERVISION AS OUTLINED."
<br />
<br />IT WAS MOVED BY HAWN AND SECONDED BY CRUMBAKER THAT THE REPORT OF THE CITY MANAGER BE RECEIVED
<br />AND PLACED ON FILE AND THAT THE RECOMMENDAT~'ON CONTAINED THEREIN BE ADOPTED. MOTION CARRIED.
<br />
<br />4. A REPORT OF THE CITY MANAGER RE: PROHIBITING AND/OR CONTROLLING THE INSTALLATION OF ELECTRIC
<br />FENCES, WAS SUBMLTTED AND READ AS FOLLOWS:
<br />
<br />"MY ATTENTION HAS BEEN CALLED RECENTLY TO THE NEED OF ORDINANCES PROHIBITING AND/OR CON-
<br />TROLLING THE INSTALLATION OF ELECTRIC FENCES WITHIN THE CITY OF EUGENE. ONLY RECENTLY A FENCE OF
<br />THIS TYPE HAS BEEN ERECTED ADJACENT TO THE SWiMMING POOL PROPERTY.
<br />
<br />IN INVESTIGATING THIS MATTER, IT IS DISCOVERED THAT WE HAVE NO ORDINANCE REGULATING OR COVER-
<br />ING SUCH TYPES INSTALLATIONS. I FEEL CERTAIN THAT THE COUNCIL WILL AGREE, THAT THE PRESENCE OF AN
<br />ELECTRIC FENCE NEAR A SWIMMING POOL OR RECREATIONAL AREA PROVIDES A DEFINITE HAZARD TO CHILDREN WHO
<br />WILL BE USING SUCH AREAS, AND I RECOMMEND TO THE COUNCIL AT THIS TIME, THAT AUTHORIZATION BE GIVEN
<br />TO THE CITY ATTORNEY TO PREPARE AN ORDINANCE COVERING THIS MATTER."
<br />
<br />IT WAS MOVED BY BAILEY AND SECONDED BY HANNS THAT THE REPORT OF THE CITY MANAGER BE RECEIVED
<br />AND PLACED ON FILE AND THAT THE RECOMMENDATION BE APPROVED. MOTION CARRIED.
<br />
<br />5. A REPORT OF THE CITY MANAG~R RE: EXCHANGE OF PROPERTY WITH LANE COUNTY TO PROVIDE ONE~WAY
<br />TRAFFIC CONTROL AT THE SWIMMING POOL SITE, .WAS SUBMITTED AND READ AS FOLLOWSt
<br />
<br />"I WISH TO REPORT SATISFACTORY PROGRESS IN THE CONSTRUCTION OF EUGENE'S MEMORIAL SWIMMING
<br />POOL. THE CEMENT WALLS fOR THE BUILDING PROPER, AND THE FILTRATION PLANT ARE BEING POURED AND
<br />PLANS ARE PROCEEDING FOR STARTING INST~LLATION OF PLUMBING AND HEATING EQUIPMENT AS QUICKLY AS
<br />THIS PART OF THE WORK IS COMPLETE.
<br />
<br />IN THIS CONNECTION, I HAVE RECEIVED A REPORT FROM OUR BUILDING DEPARTMENT WITH REFERENCE
<br />TO THE NECESsiTY OF OBTAINING A STRIP OF LAND ALONG THE NORTH SIDE OF THE PRESENT SWIMMING
<br />POOL SITE TO PROVIDE FUTURE ACCESS TO THE SITE FROM 15TH AVENUE WEST AND TO PERMIT ON~-WAY
<br />TRAFFIC CONTROL AFTER THE POOL IS IN OPERAT~ON.
<br />
<br />I SOLICIT YOUR CONCURRENCE WITH THE RECOMMENDATION AS CONTAINED IN THE REPORT BOTH WITH
<br />REFERENCE TO THE CHANGE OF PROPERTY AS OUTLINED IN ORDER TO RROVIDE ADDITIONAL ACCESS AND ALSO
<br />FOR PERMISSION OF THE COUNCIL TO BEGIN NEGOTIATIONS WITH THE COUNTY COURT LOOKING TO AN OPTION
<br />TO PURCHASE OR AN AGREEMENT OF FIRST REFUSAL, OF THE BALANCE OF THE COUNTY OWNED PROPERTY LYING
<br />WEST OF THE SWIMMING POOL SITE AND SOUTH OF THE MEANDER LINE OF THE AMAZON CREEK."
<br />
<br />IT WAS MOVED BY HAWN AND SECONDED BY CRUMBAKER THAT THE REPORT OF THE CIT~ MANAGER BE RECEIVED
<br />AND PLACED ON FILE AND THAT THE RECOMMENDATION fOR THE,EXOAANGE OF PROPERTY AT THE SWIMMING POOL
<br />SITE BE ADOPTED PROVIDED THAT THE PROPER CITY OFFICERS WERE UNABLE TO ACQUIRE THE NECESSARY STRIP OF
<br />LAND BY PURCHASE FROM LANE COUNTY. MOTION CARRIED.
<br />
<br />6. A LETTER ADDRESSED TO THE OFFICE OF THE CITY MANAGER FROM MR. HENRY BERK OF PORTLAND, OREGON
<br />RE: OPTION ON MILLRACE POWER PLANT WAS SUBMITTED AND READ AS FOLLOWS:
<br />
<br />"ENCLOSED PLEASE FINO CASHIER'S CHECK FOR $375.00 FOR A 90 DAY OPTION TO PURCHASE THE GEN-
<br />ERATING EQUIPMENT OF THE FORMER EUGENE POWER COMPANY AS OU~LINED IN YOUR LETTER OF MAY 12TH,
<br />AND I WISH TO OBTAIN A 90 DA~ OPTION TO PURCHASE THIS EQUIPEMENT AS I MAY NEED MORE TIME DUE
<br />TO PRESENT UNSETTLED ECONOMIC CONDITIONS.
<br />
<br />THE ABOVE REFERRED TO GENERATING EQUIPMENT CONSISTS IN GENERAL OF THE FO~LOWING;
<br />
<br />LEFF~L WATER WHEEL, TYPE B, ORDER W1286, COMPLETE O.E. GENERATOR, 375 KVA, 3 PHASE, 60
<br />CYCL-E, TYPE ATL-32-375-M 2300 VOLTS, 225 R.P.M. SER. No. 4098097. G. [, OJ'lFlI?;.~l CURRENT
<br />GENERATOR, COMPOUND WOUND, TYPE MPL, 12 KW., 125 'vOLTS, SERIAL NO. 5964. SWITCHBOARD,
<br />4 PANEL, COMPLETE WITH OIL CIRCUL BREAKERS, BREAKERS, VOLTAGE REGULA~OR, INSTRUMENT
<br />TRANSFORMERS, METERS, WIRING, 2-2400-120/240 V. LIGHTING TRANSFORMERS, CONDUIT, RESISTORS,
<br />ETC.
<br />
<br />__~--':~;~:j~_.-c..,__...;:,.:_j:.
<br />
<br />i
<br />~
<br />
<br />._-'"--'-"-'-'-'~'~~.~~"''''-''"':'_'--
<br />
|