<br /> b)2~
<br /> {." ,
<br /> INTER-CITY SAND &, GRAVEL COMPANY
<br /> EXCAVATION 795 CU.YD. @ $ .80 $ 636.00
<br />I 2" ASPHALT TOP PAVING 1967 SQ.YD. 1.01 1,986.67 t:~
<br /> 6" B~SE CRUSHED GRAVEL 1967 SQ. YD. .60 I, 180.20 .{~
<br /> COMB.' CURB &, GUTTER, STRAIGHT 952 llN.f"T. 1.60 1,523.20 !'~ .....
<br /> ........
<br /> COM B, CUR B &, GU T T E R , CIRCULAR 57 LIN.f"T. 1.90 108.30
<br /> 8-INtH CULVERT PIPE, IN PLACE 60 LIN.f"T. 2.00 120.00
<br /> CATCH BASIN INLETS, F"LAT GRATE I EACH 80.00 80.00
<br /> CE'MEN T SIDEWALK 4759 SQ.f"T. .33 1,570.47
<br /> $ 7,204.84
<br />I ACME ~ONSTRUCTION COMPANY
<br /> EXCAVATION 740 Cu.Yo. @ $ .75 $ 555.00
<br /> 6" ASPHALTIC CONCRETE PAVING 1967 SQ. YD. 2.50 4,917.50
<br /> I" CRUSHED GRAVEL 1967 SQ.YD. . 10, 196.70
<br /> COMB, 'CURB &, GUTTER, STRAIGHT 952 lIN.f"T. 1.75 1,666.00
<br /> COMB, CURB &, GUTTER, CIRCULAR 57 LIN.f"T. 2.00 114.00
<br /> 8-INCH CULVERT PIPE, t N PLACE 60 LIN.FT. 2.25 135.00
<br />. CATCH BASIN INLETS, F"L/IT GRATE I EACH 60.00 60.00
<br /> CEMENT SIDEWALK 4759 5Q.f"T. .35 1,665.65
<br /> 8 9,309.85
<br /> INTER-CITY SAND &, GRAVEL COMPANY
<br /> EXCAVATION 740 CU.YD. 8 $ .80 & 592.00
<br /> 6" ASP HA L TIC CONCRETE PAVING 1967 SQ. YD. 2.45 4,819.50
<br /> I" C R U S HE 0 GRAVEL 1967 SQ.YD. . ,2 236.04
<br /> COMB, CURB &, GUTTER, STRA I GHT 952 LIN.f"T. 1.60 1,523.20
<br /> COMB, CU RB &, GU T T E R , CIRCULAR 57 LtN.FT. 1.90 108.30
<br /> 8-INCH CULVERT PIPE, IN PLACE 60 tIN.FT. 2.00 120.00
<br /> CATCH BASIN INLETS, F"LAT GRATE I EACH 80.00 80.00
<br /> CEMENT SIDEWALK 4759 SQ.f"T. .33 1,570.47
<br />I 8 9,049.16
<br /> ALL BIDS WERE ACCOMPANIED BY A CERTIF"IED CHECK OR BIDDERS BOND AND WERE IN PROPER ORDER. CITY
<br /> MANAGER RECOMMENDED ACCEPTANCE OF" THE LOW BID OF" INTER-CITY 5AND &, GRAVEL GOMPAN Y.
<br /> IT WAS MOVED BY CRUMBAKER, SECONDED BY HAWN THAT THE BID OF" INTER-CITY SAND &, GRAVEL COMPANY,
<br /> IN THE SUM OF" $7,204.84, BE IN G THE BEST AND LOWEST BID S U BM I T TED, THAT THE PROPER CITY OF"F"ICERS
<br /> BE INSTRUCTED TO ENTER INTO A CONTRACT IV I TH INTER-CITY SAND &, GRAVEL COMPAN Y F"OR PAVING KINCAID
<br /> STREET F"ROM 28TH TO 29TH AVENUE. ROLLCALL VOTE. DAVIS AND BAILEY ABSENT. MOTION CARRIED.
<br /> 3 THIS BE I NG THE DATE SET F"OR THE CONSIDERATION OF" BIOS F"OR COMBINATION CUR B &, GUTTER ON 23RD
<br /> AVENUE F"ROM THE WEST LINE OF" KINCAID STREET TO HARRIS STREET, THE CITY MANAGER REPORTED THAT BIOS
<br /> HAD BEEN OPENED PUBLICLY ON AUGUST I 3, 1948, AT 2:00 P.M., AND HAD BEE N RECEIVED AND TABULATED AS
<br /> F"OLLOWS:
<br /> STIEN BROTHERS
<br /> EXCAVATION 20 CU.YD. 8 8 1.00 '$ 20.00
<br /> COMB, CURB &, GUTTER, STRAIGHT . 733 tlN.FT. 1.75 I ,282.75
<br /> $ 1,302.75
<br /> C. M. KEMP
<br />I EXCAVATION 20 CU.YD. 8 3 2.25 3 45.00
<br /> COMB, CURB &, GUTTER, STRAIGHT 733 lIN.f"T. 1.60 1,172.80
<br /> $ I ,2 17. 80
<br /> BOTH BIDS WERE ACCOMPANIED BY A CERTIF"IED CHECK OR BIDDERS BOND AND WERE IN PROPER ORDER. CITY
<br /> MANAGER ijECOMMENDED ACCEPTANCE OF" THE BID OF STIEN BROTHERS.
<br /> IT WAS MOVED BY CRUMBAKER, SECONDED BY HAWN THAT THE BID OF" STIEN BROTHERS, IN THE SUM OF"
<br />I $1,302.75 BE ACCEPTED, AND T HA T THE PROPER CITY OF"F"ICERS BE INSTRUCTED TO ENTER INTO A . COta RACT
<br /> WITH STIEN BROTHERS FOR COMBINATION CURB AND GU T T E R ON 23RD AVENUE F" R OM THE WEST LI NE OF" KINCAID
<br /> STREET TO HARRIS STREET. ROLLCALL VOTE. DAVIS AND BAILEY ABSENT. MOTION CARRIED.
<br /> 4 THIS BEING THE DATE SET F"OR THE CONSIDERATION OF" BIDS F"OR THE CONSTRUCTION OF" A CONCRETE
<br /> SIDEWALK ON THE EAST SIDE OF" CHULA VISTA S:rREET BETWEEN 26TH AND REED AVENUE, THE CITY MANAGER
<br /> REPORTED THAT BIDS HAD BEEN OPENEO PUBLICLY ON AUGUST 13, 1948, AT 2:00 P.M., AND HAD BEEN
<br /> RECE I VED AND TABULATED AS F"OlLOWS:
<br /> n ~
<br />~~-'~'--'--'--"-.~"-~..- _....~~ ._~ '. -;,.", L~,. -;J. , .'" '" .- -~,- " . '~_.J. ,-~'"'...,,_...