Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />r""364 <br /> <br /> <br />~ <br /> <br />~ <br /> <br />.--:-'f!'- <br /> <br />THERE ARE 785 PARKING METERS IN SERVICE WITH INCOME rROM MARCH Or $6,316.61, WHICH IS <br />APPROXIMATELY $8,10 PER METER, PER MONTH, AND 260 METERS WERE SERVICED DURING THE MONTH. <br /> <br />STREET AND SEWER IMPROVEMENT <br /> <br />I <br /> <br />THE ~500 GAL~ON STREET FLUSHER WAS COMPLETED AT .AN APPROXI~A~E COST OF $2,300.00 AND <br />WAS PUT INTO USE DURING THE PAST WEEK. EARLY MORNING SHIFT GOES TO WORK AT 2:00 A.M. AND IS <br />REPLACED BY THE DAY SHIFT AT 10:00 A.M: A PUMP WAS PURC"HASED AT A COST Or ~395.0'0 FOR INSTAI::LA- <br />TION ON THE OLD DODGE SHORT WHEELBASE CAB-OVER UNIT rOR USE IN FLUSHING ALLEYS AND PLACES TOO <br />SMALL rOR THE LARGE UNIT TO CLEAN. IN THIS CITY~WIDE CLEANING PROGRAM THE CITY HAS BEEN <br />DIVIDED INTO SECTIONS rOR REGULAR FL~S~ING. OF THE VARIED METHODS Or STREET CLEANING, rLUSH- <br />ING IS UNEQUALLED FOR CLEANLINESS IF PROPER DRAINAGE EXISTS. <br /> <br />I <br /> <br />CONCERTED ErrORTS WILL BE MADE TO INSTALL MORE STREET SIGNS AT INTERSECTIONS THROUGH- <br />ouT THE CITY~ Two MEN ARE WORKING AT THIS NOW. COST OF THESE WOODEN SIGNS IS APPROXIMATELY <br />$6.00 PER INTERSECTION WHICH IS A VERY ECONOMICAL INSTALLATION. EASILY READABLE FROM THE <br />PROPER HEIGHT AND THEY ARE ALSO READABLE FROM THE SIDEWALK. <br /> <br />. . <br />RELATIVE TO THE BASIC PLAN OF IMPROVEMENT FOR SANITARY AND STORM SEWERS FOR THE CITY OF <br />EUGENE, AND THE SEWAGE DISPOSAL PLANT, THOROUGH STUDY AND CONSIDERATION MUST BE GIVEN TO <br />ANTICIPATED TERRITORIAL EXPANSION WITH RELATED GRAVITY FLOWS AS WELL AS POPULATION INCREASE <br />AND INDUSTRIAL DEVELOPMENT. THE ESTABLISHMENT OF A NEW GARBAGE DUMP THROUGH COUNTY ASSESS- <br />MENT CONTROL IS A VERY COMMtNDABLE MOVE AND SHOULD BE EXPEDITED AS RAPIDLY AS POSSIBLE. IT <br />WOULD ALSO SEEM DESIRABLE TO SUPPLEMENT PRESENT CITY AND COUNTY PROGRAM OF RODENT CONTROL WITH <br />A CONCERTED COOPERATIVE PROGRAM OF FLY AND MOSQUITO ELIMINATION DURING SUMMER MONTHS, WHICH <br />COULD BE ACCOMPLISHED WITHOUT ~ GREAT DEAL OF COST. <br /> <br />~ARKS AND RECREATION <br /> <br />. <br />THE RECREATIONAL PROGRAM OF EUGENE HAS BEEN VERY COMMENDABLE. IT 15 PLANNED TO HAVE A <br />MEETING OF THE HEALTH AND RECREATION COMMITTEE WITHIN THE NEXT FEW DAYS FOR THE PURPOSE OF <br />SELECTING A PARK AND RECREATIONAL DIRECTOR. THIS APPOINTMENT SHOULD CONSisT OF A MAN WELL- <br />VERSED IN PARK IMPROVEMENT AND MAINTENANCE AND LANDSCAPE DEVELOPMENT AS WELL AS RECREATIONAL <br />.~CTIVITIES, WITH THE ULTIMATE COAL Or IMPROVING AND DEVELOPING THE PARK SYSTEM WITHOUT CUR- <br />~AILING THE RECREATIONAL PROGRAM TO ANY GREAT EXTENT. <br /> <br />A MEMORIAL SWIMMING POOL COMPLETED LAST YEAR WILL BE ACTIVATED THIS SUMMER, NECESSITATING <br />1949-50 BUDGET EXPENDITURE OF $16,562.00 INCLUDING 85,948.00 FIN~L PAYMENT TO STIEN BROTHERS. <br />~~NTRACTORS. ANTICIPATED GROUND IMPROVEMENT OF $5,425.00, LOCKER ANO SHOWER EQUIPMENT AND <br />MISCELLANEOUS $1,575.00 AND OPERATIONAL SUPPLIES AND EXPENSE OF $3.612.00. THIS IS A BEAUTIFUL <br />MEMORIAL TO THE CITY OF EUGENE WHICH WILL CERTAINLY BE USED. <br /> <br />I <br /> <br />ENGINEERING DEPARTMENT <br /> <br />~ THE SEWER PROJECT UNDERWAY BY THE P. S. LORD CONSTRUCTION COMPANY IS PROGRESSING IN A <br />MORE SATISFA~TORY MANNER WITH THE WEATHER CLEARER. WORK IS BEING CONCENTRATED IN SECTION I <br />wiTH COMPLETION OF SECTIONS 2 AND 3 EXPECTED BY MAY I, AND COMPLETION OF ENTIRE PROJECT BY <br />JUNE 30, INCLUDING THE PUMPING STATION AT 13TH AND ALMADEN. THE lORD CONSTRUCTION COMPANY <br />WILL BE EXPECTED TO CLEAN UP THIS ENTIRE AREA IN A SATISFACTORY MANNER AT THE EARLIEST POSSIBLE <br />DATE. <br /> <br />IN ADDITION TO THE WEST SIDE SEWER PROJECT, THEENGINEERING DEPARTMENT HAS UNOERWAY, NINE <br />PAVINQ JOBS AND ONE SEWER ~OB OF WHICH BIDS WERE OPENED fRIDAY, APRIL 8, AND THERE ARE 29 <br />PAVING PETITIONS IN AND FOUR SEWER DISTRICTS UNDERWAY. <br />. . <br /> <br />IN THE OPENING OF BIDS LAST FRIDAY ON THE NINE PAVING DISTRICTS IT IS NOTED THAT <br />.. <br />ALTERNATE BIDS ON ASPHALTIC AND CONCRETE PAVING RESULTED IN BID PRICES OF $4.25 ON THE 2" <br />~SPHALTIC TOP WITH 6~ ROCK BASE AGAINST $6.20 FOR 6" ASPHALTIC CEMENT IN COMPARISON WITH 7" <br />CONCRETE INTEGRAL CURB PAVING AT $6.41 WHICH SHOWS A DIFFERENCE OF $2~16 PER FRONT FOOT <br />BETWEEN THE 2" ASPHALT AND THE 7" CONCRETE. COPIES OF THESE COMPARATIVE BIDS ARE SUBMITTED <br />TO THE MAYOR AND COUNCIL. <br /> <br />IT IS RECOMMENDED THAT FUTURE PAVING IN THE CITY OF EUGENE CONSIST Or THE 7" INTEGRAL <br />CONCRETE, IF THE PROPERTY OWNERS CAN SUBSTANTIATE SUCH A PROGRAM. THIS TYPE OF' PAVING IS - <br />PERMANENT AND WOULD BE LESS ExPENSIVE IN THE LONG RUN AND PRACTICALLY ELIMINATE FUTURE <br />MAINTENANCE. <br /> <br />I <br /> <br />RELATIVE TO ~LIVE STREET SEWE~ BETWEEN 23RD AND 24TH WHICH BIOS WHICH WERE OPENED MARCH <br />28TH, IT IS RECOMMENDED BY THE ENG'INEERING DEPARTMENT THAT THESE BIDS BE REJECTED DUE TO THE <br />HIGH COST OF $5.22 PER FOOT. PROPERTY OWNERg HAVE AGREED TO ADJUST THEIR IMPROVEMENT <br />ACCORDINGLY. THIS PROJECT WILL BE RE-FIGURED WITH GRADES AT A HIGHER ELEVATION WHICH WILL <br />REDUCE THE UNIT COSTS. <br /> <br />I <br /> <br />IT IS RECOMMENDED THAT NOW THAT GOOD WEATHER IS HERE THAT ALL BUSINESS SIDEWALKS BE <br />REPAIRED BY THE MERCHANTS. <br />