Laserfiche WebLink
<br />~~ <br /> <br />l <br /> <br />FUEL GI~ (CONT'D) <br /> <br />CENTRAL HEATING COMPANY <br />STOVE OIL P.S. 100 <br />DIESEL OIL P.S. 200 <br />. <br />LT. FUEL OIL P.S. 300 <br /> <br />PRICE PER GAL. FOR <br />SINGLE DEL. OF 400 <br />GAL. OR MORE AT <br />EUGENE <br />$ <br /> <br />PRICE PER <br />BARREL OF <br />42 GALS. <br />$ <br /> <br />.144 - <br />.129 <br /> <br />3.75 F.O.B. <br />EUGENE, LESS <br />2%, 30 DAYS <br /> <br />MANERUD HUNTINGTON FUEL COMPANY <br />STOVE OIL P.S. 100 <br />DIESEL OIL P.S. 200 <br />LT. FUEL OIL P.S. 300 <br /> <br />.144 <br />. 129 <br /> <br />3.75 F.O.B. <br />EUGENE, LESS <br />2% <br /> <br />PETRO-LANE OIL COMPANY <br />STOVE OIL P.S. 100 <br />DIESEL OIL P.S. 200 <br /> <br />.139 <br />. 12~ <br /> <br />ALL BIDS WERE IN PROPER ORDER. ,CITY MANAGER RECOMMENDED THAT THE BID OF THE PETRO-LANE OIL <br />COMPANY FOR STOVE OIL, P.S. 100 AT $.139 PER GALLON AND THAT THE BID OF THE SHELL OIL LOMPANY <br />FOR DIESEL OIL, P.S. 200 AT $.118 PER GALLON BE ACCEPTED. IT WAS RECOMMENDED" FURTHER TfiAT THE <br />BIDS OF THE CENTRAL HEATING COMPANY AND MANERUD HUNTINGTON FUEL COMPANY ON LT. FUEL OIL P.S. 3,00 <br />AT 13.75 (LESS 2%) PER BARREL BE AC~EPTED AND ORDERS MADE TO EACH ON AN EQUAL BASIS SINCE LIMITED <br />STORAGE FACILITIES WILL NOT PERMIT PURCHASES F.O.B. PORTLAND. <br /> <br />I <br /> <br />IT WAS MOVED BY CRUM~AKER, SECONDED BY DAVIS THAT THE RECOMMENDATION OF tlTY MANAGER BE <br />ACCEPTED AND THAT PROPER CITY OFFICERS BE AUTHORIZED TO ENTER INTO CONTRACTS WITH THESE COMPANIES <br />FOR OIL REQUIREMENTS FOR THE YEAR 1950. ROLLCALL VOTE. MOTION CARRIED. <br /> <br />I" <br /> <br />REPORTS OF OFFICERS <br /> <br />4 A COpy OF THE MINUTES OF THE MEETING RELATIVE TU FIRE PROTECTION ON THE UNIVERSITY CAMPUS <br />WAS SUBMITTED. <br /> <br />IT WAS MOVED BY CRUMBAKER, SECONDED BY DAVIS THAT THE COUNCIL APPROVE THE REPORT. MOTION <br />CARRIED. <br /> <br />( <br /> <br />5 A REPORT OF THE CITY' MANAGER - RE: AMAZON FLOOD CONTROL, SEWAGE DISPOSAL, ETC., WAS SUBMITTED <br />AND READ AS FOLLOWS: <br /> <br />"I. A'ST'REET LIGHTING SURVEY AND ESTIMATE OF COSTS TO REPLACE THEM WITH NEW MERCURY <br />VAPOR SYSTEM IS BEING JOINTLY" MADE BY GENERAL ELECTRIC ENGINEERS IN CONJUNCTION WITH THE <br />EUGENE WATER & ELECTRIC BOARD. THE SURVEY WILL COVER THREE PHASES. <br /> <br />I. FRANKLIN BOULEVARD AND ALL HIGHWAYS WITHIN THE CITY. <br />2. BUSIN~SS SECTION - WILLAMETTE STREET, aLIVE, CHARNELTON, OAK AND PEARL, <br />AND CONNECTING STREETS. <br />3. RESIDENTIAL SECTION. <br /> <br />I <br /> <br />2. THE CONSULTING ENGINEERS ARE PROGRESSING SATISFACTORILY WITH THE STUDY OF A <br />METROPOLITAN SEWAGE DISTRICT. THEY ARE CORRELATING ALL THE FACTUAL INFORMATION AVAILABLE <br />FROM EUGENE, SPRINGFIELD AND LANE COUNTY AND HAVE BEEN MAKING A FIELD STUDY OF THE DRAINAGE <br />AREAS INVOLVED. ONE THING OF PARTICULAR IMPORTANCE WHICH THEY WI"LL INCLUDE IN THEIR <br />R E COM MEN 0 A T ION S 1ST H A'T E U G ENE, S P R I N G FIE L DAN 0 ALL C I TIE S L 0 CAfE 0 WIT H I NTH E W ILL AM E T T E <br />VALLEY IN CONNECTION WITH THE STATE MUST DETERMINE THE MINIMUM AMOUNT OF WATER NEEDED IN <br />THE WILLAMETTE RIVER FOR FUTURE SEWAGE DILLUTION. THIS INFORMATION SHOULD BE PROPERLY <br />REPORTED TO THE ARMY ENGINEERS FOR THEIR USE AND INFORMATION IN THE DESIGN AND CONSTRUCTION <br />OF THE MULTI-PURPosi DAMS ON THE WILLAMETTE AND McKE~ZIE RIVERS TO ASSURE ~D~QUATE CONS.ISTANT <br />o <br />FLOWS DURING LOW WATER. <br /> <br />3. NEW HOPE HAS COME ~OR THE COMPLETION OF THE AMAZON THROUGH THE RE-SURVEY NOW <br />BEING CONDUCTED BY T~E ARMY ENGINEERS. A PUBLIC HEARING HAS BEEN SET BY THE ARMY ENGINEERS <br />.. . .. <br />FOR 1:30 P.M. JANUARY 24TH ON THIS PROJECT AND IT IS SUGGESTED THAT ALL ATTEND WHO CAN <br />o .. . .. ~ <br />POSSI~LY MAKE IT. THE ARMY ENGINEERS ARE STUDYING THE PROPOSAL OF THEIR PARTICIPATION IN <br />THE ACQUISITION OF R.O.W. AND CONSTRUCTION COSTS FROM THE DIVERSION STRUCTURE ON WEST, AND <br />A~SO THEIR PARTICIPATION ON THAT PART OF THE PROJECT WITHIN THE CITY OF EUGENE AS WELL AS <br />OUTSIDE THE CITY. <br /> <br />IF THIS DRAINAGE PROJECT CAN BE COMPLETED IN ITS ENTIRETY WITH FEDERAL ASSISTANCE FROM <br />THE ARMY ENGINEERS, WOULD SUGGEST THE FOLLOWING PROGRAM FOR THE CITY OF EuGENE, NOT TO <br />., <br />EXCEED FUNDS AS VOTED FOR AMAZON DRAINAGE, PLUS FEDERAL GRANTS. <br /> <br />I <br /> <br />~ <br />