Laserfiche WebLink
<br /> 28~ <br /> j ,. -- .. --_.--,-- ...... ~ ..". .... .- -- - -- -~.- <br /> 'I --- <br /> 2ND TO COAST CONST. CO. FOR SANITARY SEWERS ON SOUTH WILLAMETTE - ORD. 9575 - $1 1~184.97. <br /> II <br /> II 3RD TO COAST CONST. CO. FOR SANITARY SEWERS ON SOUTH WILLAMETTE - ORD. -95~1 - $104~~6.21. <br /> 3RD TO COAST CONST. CO. FOR SANITARY SEWERS ON SOUTH WILLAMETTE - ORD~ 957- $9, .39. <br /> I <br /> , 2ND TO COAST CONST. CO. FOR SANITARY SEWERS ON SOUTH WILLAMETTE - O~D. 9581 - $756.80. <br /> I <br /> I 1ST TO COAST CONST. CO. FOR SANITARY SEWER IN ALLEY BET. WASHINGTON AND JEFFERSON FROM 24TH <br /> I TO 25TH AVENUE ~ $1,202.50. <br /> I, 2ND TO T. C. WILDISH FOR SANITARY SEWER ON 27TH WOODLAWN - CHERRY TO SPRING BLVD. -- $2,8\ 1.27. <br /> II 1ST TO W. H. SHIELDS CONST. CO. FOR MAINTENANCE SHOP AT 3RD AND LINCOLN - $9,346.05. <br /> II 2ND TO CASCADE CONST. & ENGR. CO. FOR BRIDGE FOR AMAZON AT PEARL - $12,030.76. <br /> I 1ST TO HAMILTON AND THOMS FOR AMAZON BRIDGE AT 31ST - $3,607.50. <br /> 1ST TO HAMILTON AND THOMS FOR AMAZON BRIDGE AT 24TH - $900.00. I <br /> 1ST TO HAMILTON AND THOMS FOR AMAZON BRIDGE AT 29TH - $3,700.00. <br /> II <br /> IT WAS MOVED BY DAVIS, SECONDED BY CRUMBAKER TRAT THE ESTIMATES AS CERTIFIED BY W. C. <br /> :1 <br /> CLUBB, C I TV ENG I NEER, AND THE CONTRACTOR, BE APPROVED AND THE PROPER CITY OfFICERS AUTHORIZED I <br /> I <br /> II TO ISSUE WARRANTS I N PAYMENT OF THE SAME. ROLLCALL VOTE. MOTION CARRIED. ! <br /> , <br /> REPORTS OF OFFICERS I <br /> 3 A REPORT OF THE CITY MANAGER - RE: AUDIT REPORT AND AMAZON PROJECT WAS SUBMITTED. <br /> ~ <br /> IT WAS MOVED BY DAVIS, SECONDED BY CRUMBAKER THAT THE REPORT OF THE CITY MANAGER BE <br /> ADOPTED. MOTION CARRIED. <br /> I REPORTS OF COMMITTEES <br /> 4 A REPORT OF THE METROPOLITAN SEWAGE COMMITTEE - RE: METROPOLITAN SEWAGE DISTRICT WAS <br /> SUBMITTED AND READ AS FOLLOWS: <br /> "A MEETING OF THE METROPOLITAN SEWAGE COMMITTEE WAS HELD AT THE CITY HALL ON AUGUST 30, i <br /> 1950 WITH THE FOLLOWING PRESENT: MAYOR JOHNSON; A. C. DIXON, SR.; JAMES RODMAN, JR.; I <br /> MARVIN T. WARLICK; ORLANDO HOLLIS; LYNN MCCREADY; G. C. BLOHM; JESSE GODLOVE; DR. <br /> CRUMBAKER; DR. TRIOLO; CITY MANAGER; CITY ATTORNEY AND CITY ENGINEER. , <br /> 'I THE CHARTER AMENDMENT DATED AUGUST 22, 1938, WAS REVIEWED WHICH AUTHORIZED THE <br /> d <br /> II COMMON COUNCIL OF THE CITY OF EUGENE TO OWN, ACQUIRE, CONSTRUCT, EQU I P, OPERATE AND <br /> !I MAINTAIN WITHIN OR WITHOUT THE CITY LIMITS OF EUGENE, A SEWAGE DISPOSAL PLANT OR PLANTS I <br /> USEfUL OR CONVENIENT FOR A COMPLETE SEWER SYSTEM INCLUDING THE ACQUISITION OF PROPERTY, <br /> I, RIGHTS-OF-WAY, OR EASEMENT AND TO ESTABLISH AND COLLECT JUST AND EQUITABLE CHARGES FOR I <br /> II SERVICE UPON ALL WATER USERS. <br /> I , <br /> Ii THE CONSULTING FIRM OF CORNELL, HOWLAND, HAYES AND MERRYFIELD, WAS REVIEWED AND I <br /> 'I <br /> il PRELIMINARY ESTIMATED COSTS OF TEN PROJECTS BY THIS FIRM WERE COMPARED WITH ACTUAL CON- <br /> il STRUCTION COSTS. THE RESULT SHOWED THAT MOST OF THE CONSTRUCTION COSTS WERE WITHIN. THE <br /> I <br /> !) PRELIMINARY ESTIMATED COST. I <br /> i <br /> ; <br /> " MR. RALPH RODERICK OF THE ABOVE ENGINEERING FIRM ANALYZED THE REVISED ESTIMATES <br /> 'I i <br /> II PERTAINING TO PLAN 8 OF THE FEASIBILlfY SURVEY TO INCLUDE EUGENE AND SURROUNDING AREAS, I <br /> BUT EXCLUDING ALL AREAS EAST OF THE WEST SIDE OF THE CITY OF SPRINGFIELD. THIS ESTIMATE( <br /> I II SHOWED IMMEDIATE CONSTRUCTION COSTS TOTALING $955,388 WHICH INCLUDED $425,388 fOR THE <br /> ,I <br /> II INTERCEPTOR SEWER fROM POLK STREET TWO MILES WEST TO THE PROPOSED LOCATION OF THE SEWAGE <br /> TREATMENT PLANT WHICH WAS ESTIMATED UNDER THIS PLAN AT AN INITIAL COST OF $530,000. THIS <br /> II REVISED PLAN WOULD INCLUDE DISTRICTS NO. 1,2,3,4,5,6 7,8,9,10, II, 12, AND 13 AS <br /> I, SHOWN ON FIGURE 15 Of THE fEASIBILITY STUDY COV~RING 33,284 ACRES TO SERVE POPULATION Of <br /> :1 <br /> I' 85,000 AND WOULD BE CAPABLE Of EXPANDING TO SERVE AN ULTIMATE POPULATION OF 232,000 OVER A <br /> il 40 YEAR PERIOD AT A TOTAL OVER-ALL ESTIMATED COST Of $7,601,886. CONSIDERABLE DISCUSSION <br /> Ii TOOK PLACE RELATIVE TO THE SIZE AND CAPACITY Of THE PROPOSED OUTFALL LINE fROM POLK <br /> STREET TO THE LOCATION Of THE SEWAGE PLANT TWO MILES WEST. THE COMMITTEE fELT THAT THIS <br /> , <br /> WAS ONE OF THE MOST IMPORTANT I TEMS AND THAT IT WOULD BE IMPERATIVE TO KNOW THAT THIS I <br /> I <br /> II OUTfALL LIN€ WAS DESIGNED TO CARRY THE ULTIMATE CAPACITY FOR THIS AREA INCLUDING BOTH <br /> II DOMESTIC AND INDUSTRIAL WASTES. MR. RODERICK STATED THAT A THOROUGH AND COMPLETE STUDY <br /> i: WOULD BE MADE BEFORE THE FINAL SIZES WERE ESTABLISHED AND ASSURED THE COMMITTEE THAT <br /> II THEIR RECOMMENDATIONS WOULD INCLUDE ADEQUATE OUTfALL LINE CAPACITY. HE STATED THAT UNDER <br /> Ii THE STATE SANITARY LAWS, IT WAS NECESSARY fOR THE CITY TO TREAT THREE TIMES THE DRY <br /> II <br /> II WEATHER CAPACITY OF THE SEWAGE SYSTEM AND THAT THE REMAINDER COULD BE DIVERTED INTO THE <br /> il WILLAMETTE RIVER DURING FLOOD SEASONS. HE GAVE THIS AS T~E REASON fOR THE REDUCTION i <br /> II FROM THE 90" PRESENT OUTFALL LINE ON POL~ STREET TO THE PROPOSED 66" LINE FROM POLK <br /> II STREET TWO MILES WEST TO THE SEWAGE PLANT. <br /> il <br /> DifFERENCES IN ESTIMATED COSTS BETWEEN COMPLETE TREATMENT AND PRIMARY TREATMENT WERE <br /> II ANALYZED WITH RELATION TO PERMANENT MINIMUM FLOWS IN BOTH THE WILLAMETTE AND McKENZIE <br /> RIVERS. IT WAS BROUGHT OUT THAT ADEQUATE MINIMUM FLOWS MUST BE MAINTAINED ON A PERMANENT <br /> I, <br /> :1 BASIS AND THE POSSIBILITY OF PREVIOUSLY ESTABLISHED WATER RIGHTS ON THE McKENZIE INFRINGING <br /> II UPON THESE MINIMUM FLOWS WAS DISCUSSED. IT WAS BROUGHT OUT THAT IF ADEQUATE MINIMUM FLOWS <br /> i' WERE REDUCED AT SOME FUTURE DATE THAT THE CITY AND DISTRICT MIGHT BE PUT TO ADDITIONAL <br /> il <br /> Ii EXPENSE TO THEN EFFECT COMPLETE SEWAGE TREATMENT. <br /> I <br /> I <br /> I <br /> I <br /> II <br /> il <br /> J ,~ <br /> ~"'--'> -"'" .'"".....c....,__"....._.._.____.~:.__..~__ _<. ,- _... -~,- '"'---'-~...........~..~-~-'-."""':....c "'-':...~"'-"""':~__.._.~._ _<....__.: ~.__._'~""""'-'-?~~~,__ <br />