Laserfiche WebLink
<br />.t:::~ <br />4tJ _~ <br /> <br />.J <br /> <br />. --- ..__._..~--_..~..,.."- ~.->_..,.--.~ -.---.,,--..--.-...... <br />_ '.~ .___~ .u_~_.__ <br /> <br />COUNCIL CHAMBERS, <br />EUGENE, OREGON. <br />MA Y 9, I 95 I . <br /> <br />I <br /> <br />AN ADJOURNED MEETING OF THE CITY COUNCIL, HELD AFTER THE BUDGET MEETING AT 9:30 P.M. <br />ON MAY 9, 1951 WAS CALLED TO ORDER BY HIS HONOR, MAYOR V. E. JOHNSON WITH THE FOLLOWING <br />COUNCILMEN PRESENT: CRUMBAKER, BOOTH, GODLOVE, KOPPE, AND SIEGENTHALER. COUNCILMEN <br />ALLEN, SMITH AND WATSON WERE ABSENT. <br /> <br />THE FOLLOWING LETTER WAS STUDIED AND IT WAS MOVED BY CRUMBAKER, SECONDED BY BOOTH <br />THAT THIS LETTER BE APPROVED AND THAT THE CITY MANAGER BE INSTRUCTED TO PRESENT IT TO THE <br />ATTORNEY FOR THE SPRINGFIELD UTILITY BOARD WITH THE REQUEST THAT A MEETING BE SET WHEREIN <br />OFFICIALS OF THE CITY OF EUGENE AND REPRESENTATIVES OF THE SPRINGFIELD UTILITY BOARD COULD <br />DISCUSS IN DETAIL THE VARIOUS ASPECTS OF A JOINT SEWAGE DISPOSAL PROGRAM. MOTION CARRIED. <br /> <br />"YOUR LETTER.OF APRIL 27TH, 1951 RELATIVE TO A COOPERATIVE AGREEMENT FOR SEWAGE <br />TREATMENT HAS BEEN REVIEWED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF EUGENE. <br />MEMBERS OF THE PUBLIC WORKS COMMITTEE AND OTHER EUGENE CITY OFFICIALS WILL BE AVAIL- <br />ABLE TO MEET WITH THE JOINT SPRINGFIELD COMMITTEE AT ANY TIME. <br /> <br />THE ADDITIONA~ INFORMATION REQUESTED IN YOUR LETTER IS OUTLINED AS FOLLbws: <br /> <br />I <br /> <br />I. WE ARE ATTACHING HEREWITH DATA SHOWING LOCATION, SIZE, PROFILES, GRADES AND <br />QUANTITY ESTIMATES COVERING THE OUTFALL LINE FROM THE PRESENT SPRINGFIELD OUTFALL TO <br />A CONNECTION WITH THE EUGENE SYSTEM. COSTS ON THIS OUTFALL LINE ARE ESTIMATED BY OUR <br />ENGINEERS AS FOLLOWS: <br /> <br />OUTFALL LINE 24" TO 30" <br />PUMPI NG STAT! ON <br /> <br />TOTAL <br /> <br />$ 222,555.00 <br />55,250.00 <br />277,805.00 <br /> <br />DIFFERENCE IN COST BETWEEN 24" <br />AND 27" OUTFALL LINE (TO BE <br />PAID BY CITY OF EUGENE) <br /> <br />12,350.00 <br /> <br />CITY OF SPRINGFIELD (TOTAL COST) <br /> <br />$ 265,455.00 <br /> <br />2. THE CITY OF EUGENE WILL CONVEY WITHOUT CHARGE TO THE CITY OF SPRINGFIELD (UNLESS <br />TERMINATED BY EITHER CITY UPON THREE YEARS WRITTEN NOTICE) SPRINGFIELD SEWAGE NOT TO <br />EXCEED I I C.F.S. FROM THE POINT OF INTERCEPTION OF THE SPRINGFIELD TRUNK SEWER WITH <br />THE EUGENE SYSTEM NEAR 6TH AND HIGH STREET TO THE SEWAGE DISPOSAL PLANT. <br /> <br />3. THE AMOUNT OF SEWAGE WHICH THE CITY OF SPRINGFIELD MAY DISCHARGE INTO THE EUGENE <br />SYSTEM AT THE POINT OF INTERCEPTION NOT TO EXCEED I I C.F.S. THIS IS BASED UPON THE <br />CAPACITY OF THE SPRINGFIELD OUTFALL LINE OF 24" WHICH WOULD AFFORD A POPULATION <br />EQUIVALENT OF 15,000 PEOPLE, WHICH WE UNDERSTAND, IS THE SAME CAPACITY AS THE PRO- <br />POSED DESIGN FOR THE SPRINGFIELD SEWAGE DISPOSAL PLANT AT THE SOUTHWEST CORNER OF <br />GARDEN WAY ON THE WILLAMETTE RIVER. <br /> <br />1 <br /> <br />4. THE ANNUAL COST WOULD INCLUDE THE OPERATING COST PLUS 2% INTEREST ON THE INVEST- <br />MENT OF THE PLANT PLUS 2% DEPRECIATION ON THE COST OF ALL UNITS OF THE PLANT EXCEPT <br />THE MECHANICAL EQUIPMENT AND 7% DEPRECIATION ON THE COST OF MECHANICAL EQUIPMENT. THESE <br />COSTS WILL BE PRORATED TO THE CITIES BASED UPON THE METERED QUANTITY OF SEWAGE TREATED. <br />THE CITY OF EUGENE DOES NOT ANTICIPATE SPRINGFIELD PAYING ANY AMMORTIZATION COSTS OF <br />THE PLANT. <br /> <br />5. WITH REFERENCE TO #5, WE WOULD LIKE TO MENTION THAT THE ENGINEERS HAVE NOT <br />PREPARED ANY PRELIMINARY PLANS, ESTIMATES OR REPORTS ON THE PROPOSED SEWAGE TREATMENT <br />FACILITIES OTHER THAN THOSE COVERED IN THE METROPOLITAN STUDY. <br /> <br />THE PLANT WILL, HOWEVER, PROVIDE FOR A RAW SEWAGE PUMPING STATION, GRIT REMOVAL <br />AND SEWAGE GRINDING FACILITIES, PRIMARY SETTLING BASINS, FOLLOWED BY CHLORINATION <br />AND SEPARATE SLUDGE DIGESTION FACILITIES. THE SLUDGE WOULD BE DEWATERED AFTER <br />DIGESTION BY MEANS OF VACUUM FILTRATION. WHILE OUR PRELIMINARY STUDIES INDICATE THAT <br />SOME SAVING CAN BE MADE BY THE INSTALLATION OF POWER GENERATING EQUIPMENT, FURTHER <br />INVESTIGATION INTO THIS MATTER WILL NEED TO BE MADE BEFORE FINAL DECISION ON THE USE <br />OF POWER GENERATING EQUIPMENT WILL BE MADE. <br /> <br />THE PRELIMINARY ESTIMATE FOR THE COST OF CONSTRUCTING THE SEWAGE TREATMENT <br />FACILITIES IS APPROXIMATELY $600,000. THE ANNUAL OPERATING COST NOT INCLUDING <br />INTEREST OR DEPRECIATION IS ESTIMATED AT $40,000. <br /> <br />6. THE CITY OF SPRINGFIELD WOULD CONTROL ALL SEWAGE AND SEWER CONNECTIONS UP TO <br />THE SOUTHWEST CORNER OF GARDEN WAY AND THE CITY OF EUGENE WOULD CONTROL AND APPROVE <br />ALL CONNECTIONS TO THE OUTFALL LINE WEST OF GARDEN WAY TO THE POINT OF CONNECTION <br />WITH THE EUGENE SYSTEM. <br /> <br />I <br /> <br />""~~ . <br /> <br />;~, ...."-~~>.."'~..' ~:":"""';;~'-"'-'~ <br /> <br />... ""~~:.u.",-,'~.=....._,_~~'. ~~~;......"'_..L..-._.""""..""-~:"-.:.......;.....;..,~:....~~_..--.;;~"2~:,_~-=l<.,.:.:....." ~.. .0;..... .,:\."" <br /> <br />.,~ <br />