My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/1952 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1952
>
07/14/1952 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2007 1:33:29 AM
Creation date
11/2/2006 3:21:46 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
7/14/1952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.-.,., ~ <br />,1,4~ <br />tit <br /> <br /> <br /> <br /> <br /> <br />..1 ~ EASTERLY ALONG THE SOUTH LINE OF 40TH AVE. EAST TO THE INTERSECTION OF THE SOUTH . <br />LINE OF 40TH AVE. EAST WITH THE EAST LINE OF HILYARD ST.; THENCE NORTHERLY ALONG <br />THE EAST LINE OF HILYARD STREET TO THE SOUTH LINE OF RICHARD'S STREET (3STH AVE) <br />AS PLATTED IN THE 4TH ADDITION TO SUNNY HOLLOW; THENCE S 890 55' EAST TO THE' <br />SOUTHEAST CORNER OF SAID 4TH ADDITION TO SUNNY HOLLOW; THENCE ~AST TO THE EASTERLY <br />LINE OF THE WEST DRIVE AMAZON BLVD.; THENCE NORTHWESTERLY ALONG THE EASTERLY LINE <br />~ i OF SA.ID WEST DRI VE AMAZON BLVD. 'Tb THE SOUTH LI NE OF JAMES BREEDI NG DONATION LAND <br />~;:: I CLAIM No. 51; THENCE S S90SS'.EA.S'T'ALONG THE SOUTH LINE OF DONATION LAND CLAIM <br />&5 No. 51 TO A POI NT ON:THE EAST UNE OF LOT 22 PROJECTED SOUTH AS PLATTED I N THE <br /><t: THI RD ADDI TI ON TO SUNNY HOLLOW; THENCE 'NORTHERLY ALONG THE EAST LI NE OF SAI D LOT <br />- 22 PROJECTED SOUTH AND THE .EAST LI NE OF LOT 22 TO TH.E NORTHEAST CORNER T'HEREOF; <br />~ THENCE S 890 55' EAST TO THE INITIAL POINT OF THE THIRD ADDITION TO SUNNY HOLLOW; <br />THENCE EASTERLY TO A POINT ON THE EAST LINE OF JAMES BREEDING DONATION LAND CLAIM <br />No. 51 SAID LAST MENTIONED POINT BEING 210 FEET NORTH OF THE SOUTHEAST CORNER OF <br />SAID DONATION LAND CLAIM No. 51; THENCE NORTHERLY ALONG THE EAST LINE OF DONATION <br />LAND CLAIM No. 51 TO THE NORTHEAST CORNER OF SAiD DONATION LAND CLAIM SAID NORTHEAST <br />CORNER BEING ON THE. SOUTH LINE OF LAKIN STREET AS DEDICATED IN THE AMENDED PLAT OF <br />~ CITY OUTLOOK; THENCE EASTERLY ALONG THE SOUTH LINE OF LAKIN STREET (30TH AVE.) TO <br />~ THE POINT OF BEGINNING. <br /> <br />,I AND THAT A RESOLUTION, AS PREPARED BY THE CITY ATTORNEY, BE ADOPTED SETTING THE PUBLIC <br />Ii HEARING'FOR THIS ANNEXATION AT THE REGULAR COUNCIL MEETING AT 7:30 P.M.' AUGUST II, 1952. <br /> <br />Ii 3. AFTER FURTHER STUDY IN CONNECT I ON WI TH FUTURE USE OF THE GROUND FLOOR I N THE <br />,; PRESENT CI TY HALL BUI LDI NG VACATED BY THE EUGENE WATER" ELECTRI C BOARD, I TIS <br />1 I' RECOMMENDED THAT AUTHORITY BE GRANTED TO MOVE .THE ~DMINISTRATIVE OFFICES, FI,NANCE <br />!i DEPARTMENT, BUILDING DEPART~~NT, MILK AND MEAT INSPECTION, AND PARKING METER OPERATIONS <br />'I' TO THE GROUND FLOOR; MOVE .T'HE ENGI NEERI NG DEPARTMENT TO THE SPACE NOW OCCUPI ED BY THE <br />I FINANCE DEPARTMENT ON THE FIRST FLOOR; MOVE THE DETECTIVE DIVISION OF .THE POLICE <br />I: DEPARTMENT TO THE AREA NOW OCCUP.lED BY THE PARKS AND RECREATION DEPARTMENT (THIS WILL <br />CONCENTRATE THE POLICE DEPARTMENT IN A MORE EFFECTIVE MANNER ON THE FIRST FLOOR); MOVE <br />THE PARKS A~D RECREATION OFFICES TO THE NORTH SECTION OF THE SECOND FLOOR; MOVE THE <br />POLICE PATROL TO 'THE NEW JAIL BUILDI:NG. <br /> <br />- - <br /> <br />THE FOLLOWING ESTIMATE IS SUBMITTED IN CONNECTION WITH. THIS WORK: <br /> <br />PAINTING $ 900.00 <br />F~OOR FI NISHING 486.00 <br />. ROOF REPAI RS 500.00 <br />CARPENTER LABOR 700.00 <br />FIRE PROTECTION .400.00 <br />PLASTER PATCHING 200;00 <br />ELECTRI~~L WIRING 400.00' <br /> <br />I: ESTI MATED TOTAIL $ 3,586.QO <br /> <br />Ii I TIS PLANNED TO DO TH I S WORK STEP BY STEP UNDER THE 1952-53 BUDGET. THE A.REAS OF <br />I: OPFI.CES VACATED ON THE SECOND FLOOR ARE AS FOLLOWS: - <br />I: <br />Iii .c. A. A. 1:,OS5 SQUARE FEET <br />Ii WATER BOARD DRAFTI NG ROOM 720 SQUARE FEET <br />Ii CI TY. ENGI NEERI NG DEPT. 1,396 SQUARE FEET <br />II BLUEPR I NT. ROOM 340 SQUARE FEET <br /> <br />II .TOTAL 3,541 SQUARE FEET <br />!I <br />I THESE OFFICES WILL BE AVAILABL~ FOR RENTAL PURPOSE~ WMICH AT THE PREVIOUS RENTAL <br />e : RATE OF 7-1/2 CENTS PER SQUARE FOOT SHOULD BRI NG IN A.BOUT $265 A MONTH INCOME. <br /> <br />4. THE PROGRAM OF SIDEWALK REPAIR THROUGHOUT THE BUSINESS SECTION WILL GET UNDERWAY <br />I SOMETIME THIS WEEK. ApPROXI MATELY 260 NOTICES HAVE ,BEEN MAILED TO PROPERTY OWNERS WHO <br />I HAVE RESPONDED IN A VERY FINE MANNER IN THIS SIDEWALK REPAIR PROGRAM IN EITHtR HAVI NG <br />II THE REPA I RS MADE THEMSELVES OR 'AUTHOR I ZING THE CITY TO GO AHEAD AND MAKE THESE REPA IRS <br />Iii AND BILL THEM FOR 'THE EXPENSE INCURRED. MR. IVAN KOEHN WILL BE IN CHARGE OF THIS WORK <br />: AND Will HAVE TWO MEN,.~ TRUCX, A SMAll CONCRETE MIXER, AND FINISHING TOOLS. IT IS <br />II PLANNED TO COVER THE BUSINESS DISTRICT FIRST, HOWEVER, RESIDENTIAL w~Lks W~I~H ARE IN <br />i CRITICAL NEED OF REPAIRS ARE ALSO UNDER THIS IMMEDIATE PROGRAM.' <br />I <br /> <br />I 5. IT IS RECOMMENDED THAT THE COUNCIL GRANT AUTHORITY TO.PURCHASE 15 LOTS I.~ THE <br />1 SOUTH AMAZON'AREA FROM MRS. .VIRGINIA A. WHITING, AND WlllIAMR. RilEY. TENTATIVE <br />AGREEMENT HAS BEEN MADE WI TH THEM TO PURCHASE THESE .LOTS AT .$150 EACH, TOTALI NG(~ <br />$2,250 TO COME OUT OF THE 1952-53 BUDGETED 'FUNDS FOR PARK AND PLAYGROUND AC~UISITION. <br />1 THI S LEAVES ONLY IS LOTS REMAI NI NG .TO BE ACQUI RE.D I N THE. SOUTH AMAZON PROGRAM, BUT <br />DOES NOT INCLUDE THE J. B. THOMPSON PROPERTY. LAST YEAR 19 LOTS WERE PURCHASED AT <br />PRICES RANGING FROM $100 TO $150 PER LOT. <br /> <br />6. FINAL INSPECTION OF THE WORK COMPLETED ON THE AMAZON PROJECT UP TO DATE WAS MADE <br />ON TUESDAY, JULY 8, IN COMPANY WITH H. M. MYRAND, PROJECT ENGINEER, PHIL COLE, CONSTRUCTION <br />DIVISION AND VERNE JONES, ENGINEERING.DIVISION OF THE U. S. ENGINEERS. THIS WORK IS <br />READY FOR FINAL ACCEPTANCE EXCEPT FOR SOME MINOR CLEANUP WORK. <br /> <br />I · <br />~ I 7. THE STATE HIGHWAY COMMISSION AT THEIR REGULAR MEETING ON THURSDAY, JULY 10, <br />~ APPROVED PARTICIPATING WITH THE CITY OF EUGENE IN THE INSTALLATION OF TRAFFIC SIGNALS <br /> <br />AT THE I NTERSECTIONS OF 6TH AND 7TH AT POLK, 6TH AND 7TH AT JEFFERSON, WITH <br />-- ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.