<br /> II AT THE PRESENT TIME, WE HAVE A rlRM COMMITMENT rROM r.H. A. rOR 91 HOUSES. ARRANGEMENTS
<br />I ii
<br /> Ii HAVE BEEN MADE WI TH THE' PAGET MORTGAGE COMPANY rOR THE F I NANC I NG OF' THESE HOMES UNDER F.
<br /> " H.II. REGULATIONS.
<br /> II
<br /> :1
<br /> i: TEN HOUSES ARE NOW'UNDER CONSTRUCTION AND rOURTEEN ADDITIONAL HOUSES W1LL GO UNDER CON-
<br /> 'I
<br /> , STRUCTl ON BY THE 1ST or JANUARY. IT IS CONTEMPL~TED THAT IF HOUSING CONDITIONS CO~TINUE,
<br /> i
<br />t....., THAT CO~TRACTS WILL BE LET FOR THEOBAlANCE WHEN THE BUILDING SEASON OP~NS IN THE SPRING.
<br />~t:' ,j ALL NECESSARY ENGINEERING WORK HAS BEEN COMPLETED AND PAID rOR. THE GRADING WORK HAS
<br />QO II
<br />< I' BEEN PRACTICALLY COMPLETED ON ALDER AND KINCAID STREETS. THE' rOLLOW1NG LATERAL SEWERS
<br />,.,..... II HAVE BEEN INSTALLED ON KINCAID S~REET:
<br /><:r il
<br /> :, 3' 'OF i 2" , -
<br /> Ii '363' or 10" " ,
<br /> II 756' OF 8"
<br /> !I
<br /> !i
<br /> :1 TOTALLING 1122; WITH SIX MANHOLES. WE ARE PREPARED TO CONTINUE WITH THE STREETS AND
<br />e 'I SEWERS AS THE PROJECT DEVELOPS. WE HAVE SIGNED A CONTRACT WITH THE WATER BOARD WHEREBY
<br /> if
<br /> ',1 THEY ARE 'STARTING IMMEDIATELY TO BRING WATER TO'THIS AREA AT, A COST OF"SOMETHING OVER
<br /> :1 $6,000.00. TELEPHONE LINES HAVE BEEN EXTENDED TO THE AREA WHERE THE HOUSES ARE NOW UNDER
<br /> II CONSTRUCT! ON, AS WELL AS EL~CTRIC LINES.
<br /> "
<br /> :1.
<br /> 'I
<br /> 'I IN VIEW OF' THE LARGE INVESTMENT THAT WE HAVE IN THIS PROJECT AT THE PRESENT TIME AND THE
<br /> II CONTINUED DEVELOPMENT, IT IS URGE~TLY REQUESTED THAT YOU EXTEND THE SEWER TO THE PROJECT
<br /> Ii AT YOUR EARLIEST CONVENIENCE.
<br />I ,I
<br /> "
<br /> Ii THE HOUSES UNDER CONSTRUCTION NOW SHOULD BE READY rOR OCCUPANCY BErORE THE WINTER IS OVER.
<br /> 'I
<br /> II PRACTICALLY ALL THE CONCRETE WORK IS NOW COMPLETED fOR THE FOUNDATIONS, E TC. , SO INCLEMENT
<br /> Ii WEATHER WILL NOT 'HINDER THE BALANCE OF THE WORK TO ANY GREAT EXTENT.
<br /> "
<br /> Ii ' .
<br /> DO-CALL ME rOR ANY F'URTHER QUESTIONS YOU ,MAY 'HAVE. "
<br /> ,!
<br /> it
<br /> I, IT WAS MOVED BY CRUMBAKER, SECONDED BY ALLEN THAT THE COMMUNICATION BE REFERRED TO THE
<br /> I: PuBLIC WORKS COMMITTEE. MOTION CARRIED. I
<br /> Ii / -, ~
<br />15 II COMMUNICATION FROM U. S. ARMY ENGINEERS - RE: AMAZON PROJECT WAS SUBMrTTED AND ,READ AS
<br /> I,
<br /> II rOLLOWS:
<br /> "
<br /> '!
<br />. Ii "THE PORTIONS or THE AMAZON CREEK PROJECT, WHICH WERE COMPLETED BY THE GOVERNMENT
<br /> 'I
<br /> I, 'IN 1952; ARE HEREBY RELEASED TO YOUR ORGANIZATION F'ORMAINTENANCE AND.OPERATION IN
<br /> d
<br /> iI 'ACCORDANCE WITH THE JOINT ASSURANCES or RESOLUTION PREPARED BY YOUR CITY AND THE AMAZON
<br /> II WATER CONTROL DISTRICT"DATED JUNE4, '1951, AND JULY 16, 1951. THE WORK WAS AUTHORIZED
<br /> :1 BY SECTION 14 OF' THE rLOOD CONTROL '~CT OF' JULY 24, 1946, 79TH CONGRESS, 2ND SESSION, AS
<br /> AMENDED.
<br /> "
<br /> i, THE COMPLETED PORTIONS CONSIST ESSENTIALLY OF' THE FOLLOWING WORK:
<br /> II
<br /> "
<br /> I:
<br /> I, it.. CONSTRUCTION OF' THE 'DIVERSION CANAL TO rERN RIDGE RESERVOIR, CONSISTI'NG OF
<br /> ,I
<br /> ,I A CANAL APPROXIMATELY 3.5 MilES IN LENGTH, INCLUDING DIVERSION AND OUTLET CONTROL STRUC-
<br />I "
<br /> ,
<br /> " TURES, CULVERTS, LATERAL CANALS AND LEVEES WAS COMPLETED OCTOBER 15, 1952.
<br /> I'
<br /> I:
<br /> I: B. IMPROVEMENT or AMAZON CREEK'~HANNEL WAS COMPLETED JULY:2, 1952, AT THE ~OlUOWING
<br /> ,:
<br /> i! LOCATIONS: 765 LINEAR FEET AT BAILEY HILL ROAD BRIDGE; 370 LINEAR rEET AT OAK PATCH ROAD
<br /> ':
<br /> i: BRIDGE; AND APPROXIMATELY 2,500 LINEAR f"E.ET IMMEDIATELY DOWNSTREAM FROM THE WEST LINE OF'
<br /> /'
<br /> ,i ~HAMBERS STREET. '
<br /> I, .. '
<br /> "
<br /> " ONE COpy OF THE rLOOD CONTROL REGULATIONS PRESCRIBED BY THE SECRETARY or THE ARMY
<br />e Ii
<br /> F'OR THE MAINTINANCE AND OPER~TION or rlOOD CONTROL WORKS CONSTRUCTED BY THE GOVERNMENT IS
<br /> II ENCLOSED. YOUR ATTENTION IS INVITED PARTICULARLY TO PARAGRAPHS 20B.10(A) GENERAL, 20B. 10
<br /> (B) LEVEES, 20B.10(D) DRAINAGE STRUCTURES, 20B.10(G) GHANNELS AND rLOODWAYSi AND 208~10(H)
<br /> I MISCELLANEOUS rACILITIES, WHICH DESCRIBE YOUR RESPONSIBILITIES IN'CONNECTION WITH THE WORKS
<br /> I ~ CONSTRUCTED BY THE GOVERNMENT.
<br /> "
<br /> \1 ONE COPy OF AN INF'ORMATION CIRCULAR PREPARED BY THis OrF'ICE TO SUPPLEMENT PARAGRAPH
<br /> II
<br /> 11 208.10(A)5 Of THE rLOOD CONTROL REGULATIONS REF'ERRED TO ABOVE IS ALSO INCLOSED. THIS I
<br /> Ii CIRCULAR OUTLINES IN DETAIL THE PROCEDURE TO BE F'OLLOWED WHEN IT IS PROPOSED TO PLACE ANY- 1
<br /> I' STRUCTURE, MAKE ANY REVISION OR PERFORM ANY OTHER KIND or WORK WITHIN THE ESTABLISHED
<br /> ,I LIMITS or YOUR CANAL RIGHT-OF'-WAY~ IT IS BELIEVED THAT THESE REGULATIONS WtLL BE OF VALUE
<br /> I!
<br /> :' TO YOU 'IN THE MAINTENANCE AND OPERATION or YOUR 'CANAL'AND RELATED F'LOOD CONTROL WORKS.'
<br /> Ii
<br /> II ,
<br /> " I
<br /> "
<br /> " UNLESS THE CANAL AND OTHER F'LOOD CONTROL WORKS UNDER YOUR JURISDICTION ARE REGULARLY
<br /> II AND PROPERLY MAINTAINED IN ACCORDANCE WITH THE fNCLOSEDREGULATIONS, THE rURTHER EXPENDI- I
<br />I :1 TURE o~-GOVERNMENT FONDS' rOR F~TURE WORK MAY BE DIFF1CULT'TO OBTAIN. AN IDENTICAL LETTER
<br /> L
<br /> Ii HAS ALSO BEEN WRITTEN TO THE AMAZON WATER CONTROL DISTRICT'APPRISING THAT ORGANIZATION
<br /> I'
<br /> I: OF ITS RESPONSIBILITIES IN OPERATING AND MAINTAINING THE COMPLETED wORK."
<br /> 'I
<br /> II
<br /> I'
<br /> II
<br /> II
<br /> II ,
<br /> "
<br /> I
<br />e II
<br /> ,I
<br /> II
<br /> Ii
<br /> !I
<br /> ~ i ~
<br /> 'i"
<br />
|