Laserfiche WebLink
<br /> 25~ <br />e' <br /> II AT THE PRESENT TIME, WE HAVE A rlRM COMMITMENT rROM r.H. A. rOR 91 HOUSES. ARRANGEMENTS <br />I ii <br /> Ii HAVE BEEN MADE WI TH THE' PAGET MORTGAGE COMPANY rOR THE F I NANC I NG OF' THESE HOMES UNDER F. <br /> " H.II. REGULATIONS. <br /> II <br /> :1 <br /> i: TEN HOUSES ARE NOW'UNDER CONSTRUCTION AND rOURTEEN ADDITIONAL HOUSES W1LL GO UNDER CON- <br /> 'I <br /> , STRUCTl ON BY THE 1ST or JANUARY. IT IS CONTEMPL~TED THAT IF HOUSING CONDITIONS CO~TINUE, <br /> i <br />t....., THAT CO~TRACTS WILL BE LET FOR THEOBAlANCE WHEN THE BUILDING SEASON OP~NS IN THE SPRING. <br />~t:' ,j ALL NECESSARY ENGINEERING WORK HAS BEEN COMPLETED AND PAID rOR. THE GRADING WORK HAS <br />QO II <br />< I' BEEN PRACTICALLY COMPLETED ON ALDER AND KINCAID STREETS. THE' rOLLOW1NG LATERAL SEWERS <br />,.,..... II HAVE BEEN INSTALLED ON KINCAID S~REET: <br /><:r il <br /> :, 3' 'OF i 2" , - <br /> Ii '363' or 10" " , <br /> II 756' OF 8" <br /> !I <br /> !i <br /> :1 TOTALLING 1122; WITH SIX MANHOLES. WE ARE PREPARED TO CONTINUE WITH THE STREETS AND <br />e 'I SEWERS AS THE PROJECT DEVELOPS. WE HAVE SIGNED A CONTRACT WITH THE WATER BOARD WHEREBY <br /> if <br /> ',1 THEY ARE 'STARTING IMMEDIATELY TO BRING WATER TO'THIS AREA AT, A COST OF"SOMETHING OVER <br /> :1 $6,000.00. TELEPHONE LINES HAVE BEEN EXTENDED TO THE AREA WHERE THE HOUSES ARE NOW UNDER <br /> II CONSTRUCT! ON, AS WELL AS EL~CTRIC LINES. <br /> " <br /> :1. <br /> 'I <br /> 'I IN VIEW OF' THE LARGE INVESTMENT THAT WE HAVE IN THIS PROJECT AT THE PRESENT TIME AND THE <br /> II CONTINUED DEVELOPMENT, IT IS URGE~TLY REQUESTED THAT YOU EXTEND THE SEWER TO THE PROJECT <br /> Ii AT YOUR EARLIEST CONVENIENCE. <br />I ,I <br /> " <br /> Ii THE HOUSES UNDER CONSTRUCTION NOW SHOULD BE READY rOR OCCUPANCY BErORE THE WINTER IS OVER. <br /> 'I <br /> II PRACTICALLY ALL THE CONCRETE WORK IS NOW COMPLETED fOR THE FOUNDATIONS, E TC. , SO INCLEMENT <br /> Ii WEATHER WILL NOT 'HINDER THE BALANCE OF THE WORK TO ANY GREAT EXTENT. <br /> " <br /> Ii ' . <br /> DO-CALL ME rOR ANY F'URTHER QUESTIONS YOU ,MAY 'HAVE. " <br /> ,! <br /> it <br /> I, IT WAS MOVED BY CRUMBAKER, SECONDED BY ALLEN THAT THE COMMUNICATION BE REFERRED TO THE <br /> I: PuBLIC WORKS COMMITTEE. MOTION CARRIED. I <br /> Ii / -, ~ <br />15 II COMMUNICATION FROM U. S. ARMY ENGINEERS - RE: AMAZON PROJECT WAS SUBMrTTED AND ,READ AS <br /> I, <br /> II rOLLOWS: <br /> " <br /> '! <br />. Ii "THE PORTIONS or THE AMAZON CREEK PROJECT, WHICH WERE COMPLETED BY THE GOVERNMENT <br /> 'I <br /> I, 'IN 1952; ARE HEREBY RELEASED TO YOUR ORGANIZATION F'ORMAINTENANCE AND.OPERATION IN <br /> d <br /> iI 'ACCORDANCE WITH THE JOINT ASSURANCES or RESOLUTION PREPARED BY YOUR CITY AND THE AMAZON <br /> II WATER CONTROL DISTRICT"DATED JUNE4, '1951, AND JULY 16, 1951. THE WORK WAS AUTHORIZED <br /> :1 BY SECTION 14 OF' THE rLOOD CONTROL '~CT OF' JULY 24, 1946, 79TH CONGRESS, 2ND SESSION, AS <br /> AMENDED. <br /> " <br /> i, THE COMPLETED PORTIONS CONSIST ESSENTIALLY OF' THE FOLLOWING WORK: <br /> II <br /> " <br /> I: <br /> I, it.. CONSTRUCTION OF' THE 'DIVERSION CANAL TO rERN RIDGE RESERVOIR, CONSISTI'NG OF <br /> ,I <br /> ,I A CANAL APPROXIMATELY 3.5 MilES IN LENGTH, INCLUDING DIVERSION AND OUTLET CONTROL STRUC- <br />I " <br /> , <br /> " TURES, CULVERTS, LATERAL CANALS AND LEVEES WAS COMPLETED OCTOBER 15, 1952. <br /> I' <br /> I: <br /> I: B. IMPROVEMENT or AMAZON CREEK'~HANNEL WAS COMPLETED JULY:2, 1952, AT THE ~OlUOWING <br /> ,: <br /> i! LOCATIONS: 765 LINEAR FEET AT BAILEY HILL ROAD BRIDGE; 370 LINEAR rEET AT OAK PATCH ROAD <br /> ': <br /> i: BRIDGE; AND APPROXIMATELY 2,500 LINEAR f"E.ET IMMEDIATELY DOWNSTREAM FROM THE WEST LINE OF' <br /> /' <br /> ,i ~HAMBERS STREET. ' <br /> I, .. ' <br /> " <br /> " ONE COpy OF THE rLOOD CONTROL REGULATIONS PRESCRIBED BY THE SECRETARY or THE ARMY <br />e Ii <br /> F'OR THE MAINTINANCE AND OPER~TION or rlOOD CONTROL WORKS CONSTRUCTED BY THE GOVERNMENT IS <br /> II ENCLOSED. YOUR ATTENTION IS INVITED PARTICULARLY TO PARAGRAPHS 20B.10(A) GENERAL, 20B. 10 <br /> (B) LEVEES, 20B.10(D) DRAINAGE STRUCTURES, 20B.10(G) GHANNELS AND rLOODWAYSi AND 208~10(H) <br /> I MISCELLANEOUS rACILITIES, WHICH DESCRIBE YOUR RESPONSIBILITIES IN'CONNECTION WITH THE WORKS <br /> I ~ CONSTRUCTED BY THE GOVERNMENT. <br /> " <br /> \1 ONE COPy OF AN INF'ORMATION CIRCULAR PREPARED BY THis OrF'ICE TO SUPPLEMENT PARAGRAPH <br /> II <br /> 11 208.10(A)5 Of THE rLOOD CONTROL REGULATIONS REF'ERRED TO ABOVE IS ALSO INCLOSED. THIS I <br /> Ii CIRCULAR OUTLINES IN DETAIL THE PROCEDURE TO BE F'OLLOWED WHEN IT IS PROPOSED TO PLACE ANY- 1 <br /> I' STRUCTURE, MAKE ANY REVISION OR PERFORM ANY OTHER KIND or WORK WITHIN THE ESTABLISHED <br /> ,I LIMITS or YOUR CANAL RIGHT-OF'-WAY~ IT IS BELIEVED THAT THESE REGULATIONS WtLL BE OF VALUE <br /> I! <br /> :' TO YOU 'IN THE MAINTENANCE AND OPERATION or YOUR 'CANAL'AND RELATED F'LOOD CONTROL WORKS.' <br /> Ii <br /> II , <br /> " I <br /> " <br /> " UNLESS THE CANAL AND OTHER F'LOOD CONTROL WORKS UNDER YOUR JURISDICTION ARE REGULARLY <br /> II AND PROPERLY MAINTAINED IN ACCORDANCE WITH THE fNCLOSEDREGULATIONS, THE rURTHER EXPENDI- I <br />I :1 TURE o~-GOVERNMENT FONDS' rOR F~TURE WORK MAY BE DIFF1CULT'TO OBTAIN. AN IDENTICAL LETTER <br /> L <br /> Ii HAS ALSO BEEN WRITTEN TO THE AMAZON WATER CONTROL DISTRICT'APPRISING THAT ORGANIZATION <br /> I' <br /> I: OF ITS RESPONSIBILITIES IN OPERATING AND MAINTAINING THE COMPLETED wORK." <br /> 'I <br /> II <br /> I' <br /> II <br /> II <br /> II , <br /> " <br /> I <br />e II <br /> ,I <br /> II <br /> Ii <br /> !I <br /> ~ i ~ <br /> 'i" <br />