My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Overview <br /> <br />administration issues and ad hoc project needs. These committees rely on support from staff <br />throughout the partner agency organizations, primarily from the Eugene and Springfield Public <br />Works Departments. <br /> <br />Exhibit 1 on the following page reflects the interagency coordination structure supporting the <br />RWP. The TAC supports ongoing MWMC policy and coordination issues, and is coordinated by <br />Springfield. Special project teams are typically formed to manage large projects such as design <br />and construction of new facilities. These interagency staff teams are formulated to provide <br />appropriate expertise, operational knowledge, project management, and intergovernmental <br />representation. <br /> <br />Relationship to Eugene and Springfield Local Sewer Programs <br />The RWP addresses only part of the overall wastewater collection and treatment facilities that <br />serve the Eugene-Springfield metropolitan area. The Cities of Eugene and Springfield both <br />maintain sewer programs that provide for construction and maintenance of local collection <br />systems and pump stations, which discharge to the regional system. Sewer user fees collected by <br />the two cities include both local and RWP rate components. <br /> <br /> Review Draft April 21, 2005 Page 9 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.