Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvements Program <br /> <br />OTHER CAPITAL PROGRAMS <br /> <br /> · Equipment Replacement <br /> <br />The FY 05-06 Capital Programs budget includes the Equipment .Replacement projects identified in <br />the table below. <br /> <br /> Proposed Equipment Replacement Projects - FY 05-06 <br /> Project Description Proposed Budget <br /> Raw Sewage Pump (last of 4) 132,440 <br /> Recycle Pump 17,602 <br /> Washer/compactor, Screening 23,000 <br /> Activated Sludge Pump 17,000 <br /> Boiler Upgrade 130,000 <br /> Variable Frequency Drive for W2 Pump 15,000 <br /> Programmable Logic Controller 34,706 <br /> Computer Equipment 54,275 <br /> Fleet Replacement 156,110 <br /> Total $580,133 <br /> <br /> · Major Rehabilitation <br /> <br />The FY 05-06 Capital Programs budget includes the Major Rehabilitation projects identified in <br />the table below. <br /> <br /> Proposed Major Rehab Projects - FY 05-06 <br /> Project Description Proposed Budget <br /> Operations Building Improvements $50,000 <br /> Wall Replacement in Screw Pump Room $22,000 <br /> Recycle Wet Well Coating $40,000 <br /> Roof Replacement, Welding Shop $30,000 <br /> Roof Replacement, South Storage Bldg $50,000 <br /> Total $192,000 <br /> <br /> Review Draft April 21, 2005 Page 35 FY 05-06 BUDGET AND CIP <br /> <br /> <br />