My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvements Program <br /> <br />OTHER CAPITAL PROGRAMS <br /> <br /> · Equipment Replacement <br /> <br />The FY 05-06 Capital Programs budget includes the Equipment .Replacement projects identified in <br />the table below. <br /> <br /> Proposed Equipment Replacement Projects - FY 05-06 <br /> Project Description Proposed Budget <br /> Raw Sewage Pump (last of 4) 132,440 <br /> Recycle Pump 17,602 <br /> Washer/compactor, Screening 23,000 <br /> Activated Sludge Pump 17,000 <br /> Boiler Upgrade 130,000 <br /> Variable Frequency Drive for W2 Pump 15,000 <br /> Programmable Logic Controller 34,706 <br /> Computer Equipment 54,275 <br /> Fleet Replacement 156,110 <br /> Total $580,133 <br /> <br /> · Major Rehabilitation <br /> <br />The FY 05-06 Capital Programs budget includes the Major Rehabilitation projects identified in <br />the table below. <br /> <br /> Proposed Major Rehab Projects - FY 05-06 <br /> Project Description Proposed Budget <br /> Operations Building Improvements $50,000 <br /> Wall Replacement in Screw Pump Room $22,000 <br /> Recycle Wet Well Coating $40,000 <br /> Roof Replacement, Welding Shop $30,000 <br /> Roof Replacement, South Storage Bldg $50,000 <br /> Total $192,000 <br /> <br /> Review Draft April 21, 2005 Page 35 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.