My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIOSOLIDS - POPLAR PLANTATION II <br /> <br /> Facility Process Component <br /> Biosolids <br /> <br /> $319,000 <br /> Total Cost <br /> PRIOR <br />Costs EXPEND- 2005-06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Construction 319,000 319~000 <br /> TOTAL 0 319,000 0 0 0 0 319~000 <br />FUNDING SOURCE <br />Capital Reserve 319~000 319,000 <br /> TOTAL 0 319,000 0 0 0 0 319,000 <br />* Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Biosolids - Poplar Plantation II <br />DESCRIPTION: An additional 130 acres - site preparation begins in 8/05; planting in 3/06. <br />JUSTIFICATION: Land already purchased and provides additional area adjacent to BMF for application of <br />liquid and dewatered biosolids. Expansion of the BF proyides MWMC with more flexibility <br />and control of overall biosolids management program. <br />PROJECT DRIVER: Increased solids production at the ElS WPCF and currently storing an excess inventory of <br />biosolids in the lagoons. <br />PROJECT TRIGGER: Biocycle Farm Phase 1 loading limits for liquid and dewatered biosolids are reached. Aisc, <br />might accelerate if loss of cooperative farming land application sites. <br />TYPE OF PROJECT: 100% Performance <br />ESTIMATED PROJECT COST $300,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $319,000 <br />(FY 2005-06 Dollars): <br />PHASING: Budgeted for FY 2005/06 <br /> <br /> Page 51 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.