My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILLAKENZIE PUMP STATION EXPANSION <br /> <br /> Facility Process Component <br />Collection System Pump Stations <br /> <br /> $6,377,000 <br /> Total Cost <br /> PRIOR <br /> Costs EXPEND- 2005-06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Construction 6~377,000 6,377~00C <br /> TOTAL 0 6,377,000 0 0 0 0 6,377~00¢ <br />FUNDING SOURCE <br />Capital Reserve 4,177,000 4,177,000 <br />SDC Reimbursement Reserve 1,200,000 1,200,000 <br />SDC Improvement Reserve 1,000,000 1 ~000,000 <br /> TOTAL 0 6,377,000 0 0 0 0 6,377,000 <br />* Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Wiltakenzie Pump Station Expansion <br />DESCRIPTION: Add four, 14-mgd pumps to increase capacity from 80 to 135 mgd. <br />JUSTIFICATION: Additional pumping capacity is required to increase total influent pumping capacity to 277 <br />mgd. <br />PROJECT DRIVER: Systematic elimination of sanitary sewer overflows by the year 2010. <br />PROJECT TRIGGER: Collection system computer model estimates the current wet weather peak flow to plant to <br />be 264 mgd. Overall existing peak flow capacity is 175 mgd so there is already a capacity <br />deficit. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $6,000,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $6,377,000 <br />(FY 2006-07 Dollars): <br />PHASING: Budgeted for FY 2005/06 <br /> <br /> Page 60 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.