My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE ACTIVATED SLUDGE THICKENING <br /> <br /> Facility Process Component <br /> Secondary Treatment <br /> <br /> $2,657,000 <br /> Total Cost <br /> PRIOR <br /> Costs EXPEND- 2005-06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Construction 2,657,000 2~657,000 <br /> TOTAL 0 2,657,000 0 0 0 0 2i657~000 <br />FUNDING SOURCE <br />3apital Reserve 2.157.000 2,157,000 <br />SDC Reimbursement Reserve 200,000 200,000 <br />SDC Improvement Reserve 300,000 300,000 <br /> TOTAL 0 2,657,000 0 0 0 0 2,657,000 <br />Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Third Gravity Belt Thickener <br />DESCRIPTION: Third gravity belt thickener (GBT) with associated at grade building. Assumes additional <br />basement floor space is not required. <br />JUSTIFICATION: Provides additional capacity for WAS thickening and potentially delays the construction of <br />additional digesters. <br />PROJECT DRIVER: Additional capacity to provide WAS thickening with one unit offline at WWMW upper limit <br />flow projections. Nitrification required by the NPDES permit and increasing wastewater <br />flows and loads generates more WAS solids. Provide ability to conduct recuperative <br />thickening so that need for additional digestion volume can potentially be deferred. <br /> <br />PROJECT TRIGGER: Exceeding solids and hydraulic loading rate design criteria. <br />TYPE OF PROJECT: 100% Capacity <br /> <br />ESTIMATED PROJECT COST $2,500,000 <br />(FY 2004-05 Dollars): <br /> <br />INFLATED PROJECT COST $2,657,000 <br />(2005 Dollars): <br /> <br /> PHASING: Budgeted for FY 2005/06 <br /> <br /> Page 66 FY 05-06 BUDGET AND C[P <br /> <br /> <br />