My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUTH AERATION BASIN IMPROVEMENTS <br /> <br /> Facility Process Component <br /> Secondary Treatment <br /> <br /> $7,603,000 <br /> Total Cost <br /> PRIOR <br /> Costs EXPEND- 2005-06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Design & Engineering 100,000 590,000 690,000 <br />Construction 6~913,000 6~913,000 <br /> TOTAL 100,000 7~503,000 0 0 0 0 7~603,000 <br />FUNDING SOURCE <br />Capital Reserve 100,000 6,103,000 6,203,000 <br />SDC Improvement Reserve 1,400,000 1,400,000 <br /> TOTAL 100,000 7,503,000 0 0 0 0 7,603,000 <br />* Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: South Aeration Basin Improvements Design and Construction <br />DESCRIPTION: Add step feed, anoxic selectors, and fine bubble diffusers to south aeration basin. Remove <br />hydraulic restrictions in both south and north aeration basins (effluent gates). Includes <br />future primary effluent flow control gates for both north and south aeration basins. <br /> <br />JUSTIFICATION: Increase the dry weather aeration basin treatment capacity to 65 mgd with respect to <br /> ammonia (i.e., with nitrification) and increase the sustained (i.e., on a weekly basis) wet <br /> weather treatment capacity to 130 mgd. <br /> <br />PROJECT DRIVER: NPDES permit includes ammonia limit requiring nitrification in dry weather and expansion of <br /> wet weather capacity to treat wet weather flows to meet NPDES monthly and weekly <br /> suspended solids limits. <br /> <br />PROJECT TRIGGER: Maximum month dry weather flow of 25 mgd requiring nitrification. May flows and <br /> temperatures could require the use of the south aeration basins in conjunction with the <br /> north aeration basins. Peak wet weather flows above 103 mgd require hydraulic <br /> modifications. <br /> <br />TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> <br />ESTIMATED PROJECT COST $6,900,000 <br />(FY 2004-05 Dollars): <br /> <br />INFLATED PROJECT COST $7,603,000 <br />(FY 2005-06 Dollars): <br /> <br />PHASING: Budgeted for FY 2004/05, Rebudgeted for FY 2005/06 <br /> <br /> Page 69 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.