My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NINTH AND TENTH SECONDARY CLARIFIERS <br /> <br /> Facility Process Component <br /> Secondary Treatment <br /> <br /> $6,964,000 <br /> Total Cost <br /> PRIOR <br /> Costs EXPEND- 2005-06' 2006-07 2007-08 2008,09 2009-10 TOTAL <br /> ITURES <br />Design & Engineering 1,004,000 1,004,000 <br />Construction 5,960,000 5,960,000 <br /> TOTAL 0 1 ~004~000 5,960,000 0 0 0 6~964~000 <br />FUNDING SOURCE <br />Capital Reserve 1,004,000 3,960,000 4,964,000 <br />SDC Reimbursement Reserve 100,000 100,000 <br />SDC Improvement Reserve 1 ~900,000 0 1,900,000 <br /> TOTAL 0 1,004,000 5,960,000 0 0 0 6,964,000 <br />* Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Ninth and tenth secondary cladfiers <br />DESCRIPTION: This project adds two new 130-ft concrete secondary clarifiers. <br />JUSTIFICATION: The project provides additional secondary treatment and peak flOw management capacity. <br />PROJECT DRIVER: This project expands the wet weather base capacity (maximum month and maximum week <br />conditions). DEQ requirement that the peak wet weather flow (5-year, 24-hour rain event) <br />be treated by the E/S WPCF by the year 2010; need to increase the sustained secondary <br />capacity from approximately 100 mgd to 160 mgd. <br />PROJECT TRIGGER: Wet season flows through secondary treatment exceeding 134 mgd. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $6,300,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $6,964,000 <br />(FY 2005-06 Dollars): <br />PHASING: Design budgeted for FY 2005/06 <br />Construction budgeted for FY 2006/07 <br /> <br /> Page 72 FY 05-06 BUDGET AND CIP <br /> <br /> <br />