My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Ratif. of IGR Actions
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 Mtg
>
Item 2C: Ratif. of IGR Actions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:33:48 PM
Creation date
5/4/2005 3:21:27 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 14 <br /> <br /> REPORT ID: CELEG3 LEGISLATIVE TRACKING PAGE: 5 <br /> BILLS AND RESPONSE DETAIL RL <br /> DATEt~ <br /> TIME: 5:1 <br /> PM <br /> <br /> BILLS SENT DUE DATE SUBJECT PRIORITY RECOI~HENDATION <br /> <br /> COMMENTS: THIS BILL WOULD CREATE SIGNIFICANT ADMINISTRATIVE AND <br /> ENFORCEMENT PROBLEMS FOR LOCAL GOVERNMENTS, AND COULD <br /> INCREASE THE COST OF PUBLIC BUILDINGS, PERHAPS <br /> SUBSTANTIALLY. BY EXTENDING OREGON PREVAILING WAGE LAW <br /> TO "THE FABRICATION OF NON-STANDARD ITEMS MADE TO <br /> ORDER" FOR BUILDING PROJECTS, A NUMBER OF ISSUES ARE <br /> CREATED. FIRST, THERE IS NO DEFINITION IN THE BILL OF <br /> WHAT "NON-STANDARD" MEANS. A NUMBER OF BUILDING <br /> ELEMENTS AND SYSTEMS ARE POTENTIALLY "NON-STANDARD", AS <br /> THEY ARE DESIGNED AND FABRICATED FOR A SPECIFIC, UNIQUE <br /> INSTALLATION, EVEN THOUGH SOME COMPONENTS OF THESE <br /> ELEMENTS MAY BE STANDARDIZED ITEMS. EXAMPLES ARE HVAC <br /> DUCTING AND EQUIPMENT CONNECTIONS, LIGHTING SYSTEMS, <br /> GLAZING SYSTEMS, FURNITURE SYSTEMS, ETC. ANOTHER ISSUE <br /> IS THAT THESE BUILDING ELEMENTS MAY BE CONSTRUCTED <br /> OUTSIDE OF THE REGION, OUTSIDE OREGON, AND IN SOME <br /> CASES, OUTSIDE THE U.S. THERE IS NO INDICATION HOW <br /> OREGON PREVAILING WAGE REQUIREMENTS WOULD APPLY TO <br /> THESE SITUATIONS. FINALLY, ENFORCEMENT OF PREVAILING <br /> WAGE REQUIREMENTS ARE TYPICALLY DONE BY THOSE MANAGING <br /> THE CONSTRUCTION PROJECT, THROUGH PAYROLL REVIEW AND <br /> INTERVIEWS WITH WORKERS. IT IS NOT CLEAR HOW THE <br /> PREVAILING WAGE REQUIREMENTS WOULD BE MONITORED AND <br /> ENFORCES FOR THE OFF-SITE FACRICATION OF BUILDING <br /> COMPONENTS. <br /> <br /> HB <br /> 3/23/2005 4/6/2005 DEPT OF TRANSPORTATION PRI 3 OPPOSE/AM <br /> 3414 <br />RELATING <br /> RELATING TO A REPORT BY THE DEPARTMENT OF TRANSPORTATION. <br />CLAUSE <br /> <br />TITLE REQUIRES DEPARTMENT OF TRANSPORTATION TO REPORT TO INTERIM <br /> COMMITTEE ON FUNDING OPTIONS FOR HIGHWAY PROJECTS OF STATEWIDE <br /> SIGNIFICANCE. <br /> <br /> POL <br /> CONTACT RESPONDENT DEPARTMENT UPDATED PRIORITY POLICY NuMRECOP~ENDATION <br /> <br /> ERIC ERIC <br /> PWA 4/8/2005 PRI 3 YES IV.A.1 SUPPORT/AM <br /> JONES JONES <br /> <br /> COMMENTS: <br /> LIKE HB 3515, THIS BILL SEEKS TO IMPLEMENT SEVEN <br /> PROJECTS THAT APPEARED ON THE OTC'S PRIORITY LIST IN <br /> MAY 2002. IN THIS CASE, PROJECT IMPLEMENTATION WOULD <br /> OCCUR THROUGH AN ODOT STUDY DESIGNED TO FIND WAYS TO <br /> FUND THESE PROJECTS. THE MAY 2002 OTC LIST INCLUDES NO <br /> PROJECTS IN LANE COUNTY AND DOES NOT DESIGNATE FUNDING <br /> FOR TRANSPORTATION SYSTEM OMP. THEREFORE, RECOMMEND THE <br /> CITY OF EUGENE SEEK AN AMENDMENT TO UPDATE THE <br /> POTENTIAL PROJECT LIST (POSSIBLY TO INCLUDE PROJECTS IN <br /> LANE COUNTY) AND/OR INCREASE THE PRIORITY OF OMP <br /> PROJECTS FOR CONSIDERATION IN THE INTERIM STUDY. <br /> <br />http://ceonline/celeg/reports/BillsDetail.asp 4/29/2005 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.