Laserfiche WebLink
hearing ten (10) days prior to the hearing as required by Municipal Code. The LID formation hearing on April <br />20, 2005, is to review the bid information, confirm whether the LID should be formed and to identify any <br />special conditions that should be included in the resolution forming the LID. <br /> <br />CORRESPONDENCE <br /> <br />Since the mailing of the Notice of Proposed Local Improvement District, City staff received 7 phone calls from <br />property owners. Two property owners have indicated they will be attending the hearing as of noon, April 19, <br />2005. On April 14, 2005 city staffreceived an e-mail from James Spickerman of the attorney's office of <br />Gleaves, Swearingen, Potter and Scott representing the Eugene Garden Club. Although the Garden Club parcel <br />is zoned R-3, Limited High-Density Residential Zone, Mr. Spickerman states that the structure and occupancy <br />of the parcel, is permanently committed to the Garden Club use and should receive an assessment weighting <br />factor of "1" on the basis that the existing use most resembles that of a single family dwelling (see Attachment <br />C). Also, included in this attachment are other correspondences from the Eugene Garden Club that staff <br />recently received. <br /> <br />PROJECT <br /> <br />There are 23 separate unimproved alleys in the WUN totaling about 7,000 linear feet. t 60 tax lots front the <br />alleys. The City design standards will be used to improve the alleys which consist of a 14-foot wide concrete <br />alley including catch basins and piping from catch basins to the City stormwater system. <br /> <br />Attached is a map showing the limits of the improvements and the properties to be assessed (see Attachment D). <br />ASSESSEMNTS <br /> <br />Per City Code, the assessable cost for each alley is calculated and then one half.of the assessable costs are <br />apportioned to the properties based on their front footage abutting the alleys, and one half of the assessable cost <br />are apportioned to the properties based on the area of the properties within 160' of the alley. The assessments <br />are calculated separately for each alley based on the existing uses and zoning of the property within each alley. <br />The assessable front foot costs are calculated separately for each alley based onthe existing use of the parcels, <br />and the assessable area costs are calculated separately for each alley based on the permissible use of the parcels <br />under the zoning of the City. Weighting factors are applied to the front footage and area of each property per the <br />use and zoning of the property as prescribed in City Code and as listed below: <br /> <br />Single family dwelling or duplex 1.0 <br />Other residential 3.0 <br />Commercial or General Office 10.0 <br />Industrial 10.0 <br />Other 1.0-10.0' <br /> <br />*According to the most intensive use of the parcel most comparable to the use listed above as determined by the <br />city engineer. <br /> <br />The total assessable cost for each alley and the weighted front foot and area cost for each alley are shown in <br />Attachment E. <br /> <br />Based on the low bids received, the costs listed below are the total estimated assessment costs plus contingency <br />for the local improvement district. <br /> <br /> Total Assessable Cost $1,670,779 <br /> Total City Cost $ 3,670 <br /> <br /> Total Project Cost $1,674,449 <br /> <br /> <br />