<br /> /1 Fi1-Acres 1st Addition (Contd) Alternate ~
<br /> I' 2.McKenzie Road & Driveway Co. $ 19,783.81
<br /> I: Wi1dish Construction Co. 19,876.89
<br /> II Eugene Sand & Gravel Co. 22,068.96 Completion Date:
<br /> Bethe1-Danebo Sand & Gravel Co. 22,842.38 October 1, 1968
<br /> 3.1st Avenue from Universal Industrial
<br /> " Park to Seneca Road Basic
<br /> :\ McKenzie Road & Driveway Co. 94 ;881. 72
<br /> " Wild ish Construction Co. 98,122.93
<br /> Bethe1-Danebo Sand & Gravel Co. 104,084.23
<br /> Cushing Bros., Inc. 107 ,601.90
<br /> I, Bostick & Sons Coristructicn Co. No Bid
<br /> "I
<br /> , Al ternate
<br /> "
<br /> i: 93,351.26 7.9744'Pvng $26,099.86 Strm Swr
<br /> I' Wildish Cons truction Co.
<br /> " McKenzie Road & Driveway Co. 94,621. 23 8.59 48'Pvng 3,510.00 Ex Wdth
<br /> !. Bethe1-Danebo Sand & Gravel Co. 98,739.23 0.024 Sntry Swr ..
<br /> 'I Cushing Bros., Inc. 102,755.40 0.005 Levy 19;)'
<br /> i, Bostick & Sons Construction Co. 103,869.93 Completion Date:
<br /> October 1, 1968
<br /> ALLEY PAVING
<br /> 4.Between Wi11amette and Oak ..
<br /> from 27th to 28th
<br /> Parsons & Son Construction Co. 2,216.50 4.35
<br /> Walts Concrete Company 2,458.42 64.90 Drct Sntry Swr to TL 2001 .
<br /> , Fred Stubbert 2,906.90 Completion Date:
<br /> ,
<br /> , Septerrb er 1, 1968
<br /> 1: 5.Between Olive and McMillan
<br /> trom 26th to 27th'
<br /> I' Walts Concrete Company 2,848.58 5.40
<br />): Parsons & Son Construction Co. 2,918.00 Completion Date:
<br /> !, Fred Stubbert 3,655.60 ,September 1, 1968
<br /> !;
<br /> STORM SEWER
<br /> 6.Box Culvert adjacent to Lots 4-9,
<br /> Block 14, 6th Addition Bar M
<br /> Ranch and lots ad;oining on NE Basic .
<br /> Wi1dish Construction Co. 18,881.13
<br /> Fred Stubbert 19,210.50
<br />,I A. F. Stegner 25,930.50
<br />I,
<br /> :' Cushing Bros., Inc. 36,285.00
<br /> McKenzie Road & Driveway Co. No Bid
<br /> Bostick & Sons Construction Co. No Bid
<br /> Alternate
<br /> Bostick & Sons Construction Co. 15,094.00 1,666.30 Adkins $10,814.85 $10,000.00
<br /> Wi1dish Construction Co. 15,502.00 2,414.72 Offet
<br /> McKenzie Road & Driveway Co. 20,044.75 626.05 Chapman
<br /> Cushing Bros., Inc. 20,363.00 4,707.07 Total Completion Date: .
<br /> A. F. Stegner 21,459.00 October 1, 1968
<br />I Fred Stubbert No Bid
<br />"
<br />"
<br />I
<br /> 7.C1eve1and-Orr Lane from
<br /> 17th to 24th
<br />" Bostick & Sons Construction Co. 57,419.30 57,419.30 51,250..00
<br /> McKenzie Road & Driveway Co. 69,896.80 ~.
<br /> Wi1dish Construction Co. 74,523.44 Completion Date;
<br /> October 1, 1968
<br />"
<br />1, Bids - Public Works Department, Opened July 5, 1968, were submitted as follows:
<br />,
<br />I
<br /> PAVING. SANITARY AND STORM SEWERS
<br />i 1. Stoney Ridge Road from Agate Street
<br />I to N.E. 500 feet, thence east 100 feet
<br />I
<br />, (area bounded by Agate, Spring, Fir-
<br />,
<br />" land Heights, and 30th) Basic
<br /> Wi1dish Construction Co. 25,778.20'
<br /> I McKenzie Road & Driveway Co. 29,656.00' t
<br /> Alternate
<br /> Wi1dish Construction Co. 25,293.37 6.28 24'pvng
<br />;' McKenzie Road & Driveway Co. 28,448.64 7.48 28'P'Vng ..
<br />1'1 167.00j1ot Strm Swr
<br />I. 0.045 Sntry Swr Completion Date:
<br />,
<br />" 0.005 Levy October 1, 1968
<br />I.
<br />I, SAN ITARY SEWER
<br /> 2.East Bank Trunk on Goodpasture,
<br /> Kingsley Road, and along south
<br />\, boundary Marist School
<br /> Wi1dish Construction Co. 85,209.18 85,209.18 90,000.00 .
<br /> McKenzie Road & Driveway Co. 121,785.55 Completion Date: .::-
<br />l Bostick & Sons Construction Co. 158,034.19 December 1, 1968