My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/1973 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1973
>
10/08/1973 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 11:17:24 PM
Creation date
11/2/2006 4:13:23 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
10/8/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> c. The evidence in these proceedings has not shown the existence of <br /> any alternative site that is as suitable for the proposed rezoning <br /> and subsequent commercial development that is contemplated as is _- <br /> the site in question. <br />Based upon the foregoing, the Eugene City Council finds that the applicant has <br />carried its burden of proof and has shown by sufficient, probative evidence <br />that the proposed zone change is consistent with the comprehensive zoning plan, <br />that there is a public need for the zone change and subsequent commercial de- <br />velopment of the land in question, and that this public need will best be <br />served by changing the classification of this property as compared to other <br />available property. The following shall be conditions to approval of this <br />zone change: <br />1. The property shall be developed under planned unit development pro- <br /> cedures of the city of Eugene. <br />2. The areas westerly from Valley River Inn and owned by Valley River <br /> Center situated between the north line of the property previously <br /> dedicated by Valley River Center to Lane County and the south line of <br /> the May Company ownership shall be kept free of buildings and structures <br /> (except the existing maintenance building) with the covenant to be evi- <br /> denced by recorded restrictive c9venant. <br />3. From_a point due north of the westerly terminus of the bicycle path . <br /> now being constructed under contract with the State Highway Division <br /> and continuing to the most northwesterly point of Valley River owner- <br /> ship, Valley River Center shall dedicate or grant a public easement <br /> for bicycle trail, pedestrian way, and incidental public uses covering <br /> the property situated between the north line of the property previously <br /> dedicated by Valley River Center to Lane County and the northerly line <br /> of the top of the berm or existing dike, subject to the following fur- <br /> ther conditions and limitations: <br /> a. The city of Eugene will maintain all public improvements build <br /> within the easement area. <br /> b. The Valley River Center will be responsible for maintenance of <br /> the berm as a flood control device and shall have the right to <br /> enter upon the dedicated area for the purpose of necessary repairs <br /> and maintenance provided that any damage to public improvements <br /> thereon occurring as a result of the activities of Valley River I <br /> Center shall be promptly repaired by Valley River Center. <br /> d. The north line of the dedication to be made hereunder shall be . <br /> surveyed by Valley River Center within 60 days from the date here- <br /> of to establish the north line of such dedication,:and Valley River <br /> Center shall thereafter complete such dedication within 60 days <br /> after receipt of the final survey report. <br /> d. The city of Eugene shall be responsible for widening in a northerly <br /> direction the top of the existing berm in the area beyond the pre- <br /> sent fill made by Valley River Center to a width of 20 feet on the <br /> tope of the berm as measured from the south line along the top of <br /> the berm in the event development of the bicycle and pedestrian <br /> trail occurs prior to development of the adjacent property. <br /> e. The Valley River Center shall be responsible for widening in a <br /> northerly direction the top of the existing berm in the area beyond <br /> the present fill made by Valley River Center to a width of 20 feet ;_ <br /> on the top of the berm as measured from the south line along the top <br /> of the berm in the event development of the adjacent property occurs <br /> prior .to development of the bicycle-pedestrian trail, and shall notify <br /> the City when such widening is completed. <br /> f. Within 60 days after the widening of the top of the existing berm in . <br /> the area beyond the present fill made by Valley River Center as pro- <br /> vided under d. or e. above, the City shall complete a new survey of <br /> the ~idened area, and Valley River Center shall complete the dedica- <br /> tion of the top of the widened berm within 60 days after receipt of <br /> the final survey report. <br /> ~OO 10/8/73 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.