My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/18/1989 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1989
>
01/18/1989 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 3:32:23 PM
Creation date
11/2/2006 4:31:37 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
1/18/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />Mr. Boggs said to date, the total construction contract amount, including all <br />change orders, is $11,265,224. The original construction contract amount was <br />for $11,107,217. He indicated that this is still within the project budget. <br />Approximately 47 percent of the total building is complete. Phase One of the <br />project should be complete in mid-June; Phase Two should be complete by <br />Christmas. <br /> <br />Mr. Boggs called the council's attention to the fact that the screening point <br />for passengers has been moved to the first floor so that all passengers must <br />go through the security check point. This is consistent with the Federal <br />Aviation Administration's recent emphasis on security and Horizon Airline1s <br />desire to screen all their passengers leaving our airport. <br /> <br />Mr. Bennett asked if project costs are likely to exceed the allocation. <br />Mr. Boggs said there are two places where overruns could occur. One is when <br />activities in the current facility are moved to the new facility or another <br />temporary facility. Another is when the finish materials are added at the <br />end of the project. He felt that that budget and schedule are very tight, <br />but that the project could be finished without exceeding the initial <br />allocation. He indicated that the schedule would depend on the contractor's <br />performance and weather conditions. <br /> <br />Mr. Boles asked for recognition of passenger inconvenience resulting from the <br />construction. Mr. Boggs said passengers have been informed of the <br />construction through their travel agents but that additional signs could be <br />posted in the terminal. <br /> <br />e <br /> <br />Mr. Boggs forecasted some upcoming projects at the airport. In 1989 the <br />Airport Master Plan will be updated and an environmental assessment will be <br />produced. There will also be an overlay of the surface of runway 16/34, a <br />runway extension evaluation, some terminal ramp expansion, construction of a <br />parallel taxi-way, and installation of an emergency generator. The total <br />cost for these nonpassenger terminal projects is approximately $2,423,000. <br /> <br />VI. WORK SESSION: HAZARDOUS MATERIALS ORDINANCE AND A BUSINESS LICENSING <br />ORDINANCE FOR HAZARDOUS MATERIALS AND FIRE SAFETY BUSINESS LICENSES <br /> <br />Fire Marshal Roger Cleland introduced the item. The council decided to <br />postpone discussion of the ordinance until its January 23, 1989, work <br />session. <br /> <br />Mr. Bennett asked for a short summary of key issues in the ordinance before <br />that work session. Other councilors agreed that this would be helpful. <br /> <br />Mr. Holmer said he felt the council should focus on the adoption of policy; a <br />number of items in the ordinance should be decided administratively and they <br />should not have been included. Mr. Gleason agreed with this view, but said <br />in this case, the council is adopting a State code which means the extra <br />administrative details had to be included in this ordinance. <br /> <br />e <br /> <br />MINUTES--Eugene City Council <br /> <br />January 18, 1989 <br /> <br />Page 6 <br />