My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/1982 Meeting (2)
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1982
>
12/08/1982 Meeting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 9:35:00 PM
Creation date
11/2/2006 4:39:13 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
12/8/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,- <br /> M I NUT E S <br />e Eugene City Council <br /> Work Session <br /> City Council Chamber <br /> December 8, 1982 <br /> 12:30 p.m. <br /> COUNCILORS PRESENT: John Ball, D. W. Hamel, Mark Lindberg, Gretchen Mill er, <br /> Brian Obie, Emily Schue, Betty Smith, Cynthia Wooten. <br /> The work session was called to order by His Honor Mayor Gus Keller. <br /> 1. 6th/7th AVENUE IMPROVEMENTS AND STATE SIX-YEAR HIGHWAY IMPROVEMENT <br /> PROGRAM STATUS (background information distributed) <br /> A. Statels 1984-1989 Six-Year Highway Program Timetable <br /> Irv Berman, Planning Engineer, Public Works Department, discussed materials <br /> that had been distributed to councilors. He said that the Statels Six-Year <br /> Timetable is a program for State Highway capital expenditures comparable with <br /> the Eugene's Capital Improvement Program. He said that actual construction of <br /> the 6th/7th improvements had not yet been programmed for and that the City would <br />e be emphasizing the need for this project in discussion with the Highway Divisionis <br /> District Engineer in Roseburg. Mr. Berman said that Mayor Keller would speak on <br /> the matter at Oregon Transportation Commission hearings on the six-year program. <br /> Mr. Berman used visual materials to explain the State transportation planning <br /> process and the status of the 6th/7th project. <br /> Councilor Wooten asked if the 6th/7th project would be a part of the Federal <br /> Interstate system. Mr. Berman, City Traffic Engineer Jim Hanks, and City <br /> Manager Micheal Gleason responded that the project was not a part of the Interstate <br /> system and was therefore not eligible for Federal Interstate funds, but they <br /> noted that the project would be eligible for gas tax funds since it is on the <br /> Federal Primary System. Mr. Hanks said that the matching ratio would ~quire <br /> more local (in this case, State) funds for the project. <br /> Referring to the visual materials, Mr. Berman explained that the 6th/7th corridor <br /> is a IImissing linkll in making east-west State highway connections through Eugene and <br /> also in serving the sites of future industrial development identified for West <br /> Eugene and the Willow Creek area in the Metropolitan Area General Plan. <br /> Mr. Berman then indicated the major improvement projects that the City and Lane <br /> County have accomplished in the West Eugene area in the past ten years and those <br /> proposed in the CIP for the next ten years and stressed the importance of the <br /> 6th/7th project to the City's economic diversification efforts. He sai d that <br /> this same visual presentation, emphasizing these points, would be made to the <br /> Department of Transportation. <br />- <br /> MINUTES--Eugene City Council Work Session December 8, 1982 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.