My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/30/1985 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1985
>
01/30/1985 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 5:33:34 PM
Creation date
11/2/2006 4:47:18 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
1/30/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />"-:-~------ . ---.-.-- <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />ATTACHMENT A (cont'd) <br /> <br />2. Page 2-27--Amend Recommendation #2 to read II south of Santa Cl ara <br />Ave. II instead of Green Lane. Thi s change allows some additi ona 1 <br />infill of strip commercial north of Santa Clara Ave. while <br />reinforcing the professional office uses as a transition area south <br />of Santa Clara Ave. Recommendation #2 to read: <br /> <br />2. <br /> <br />Parcels south of Santa Clara Avenue and west of River <br />Road, that are not already developed for commercial use, <br />should be zoned for office development. <br /> <br />... <br /> <br />3. Page 2-29--Revi se subarea descripti on to refl ect actual zoni ng. <br />Description to read: <br /> <br />This subarea is mostly undeveloped. It contains an EWES <br />reservoir in its southeast corner. The Metro Plan <br />designation for the area is light-medium industrial. The <br />majority of land in the area was zoned for future industrial <br />use in 1982. Provision of urban level services will be needed <br />before intensification of development can occur. Principal <br />access to the site is from I rving Road. <br /> <br />4. <br /> <br />Page 2-29--Amend Recommendation #1 to delete IlLight-medium". This <br />change will leave open the issue of the appropriate land use <br />designation and zoning for the site. As a result of public testimony, <br />the Citizen Advisory Team and staff also recommend that Planned Unit <br />Development procedures replace site review. The PUD process provides <br />for public review and greater discretionary latitude relative to <br />compatibility and design requirements. Requirement #1 to read: <br /> <br />1. Use Planned Unit Development procedures to mitigate impacts <br />on existing adjacent low-density residential development <br />upon rezoning to industrial. <br /> <br />*The draft land use element reflects public input from a joint CAT and <br />Policy Committee public hearing held on October 10, and a joint Lane <br />County and Eugene Planning Commission public hearing on November 27. The <br />CAT, Policy Committee, and Eugene and Lane County Planning Commissions <br />have approved the draft and the revisions and errata as noted and <br />recommend adoption. <br /> <br />pltherra <br />1/10/85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.