Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />- <br /> <br />FIN A N C I A L D A T A <br /> <br />Pages 1 through 7 show the capital and operating costs for each of <br />the projects in the Eugene Agenda including the Library and the Pool. <br /> <br />Page 8 summarizes all the project costs and includes the other unfunded <br />capital and operating expenses for a total of additional cash needs. <br /> <br />Page 9 shows the projected income streams from a 1% Income Tax and a <br />1% Employee Payroll Tax. <br /> <br />Page 10 compares the projected Tax Increment revenue streams without <br />the passage of the Sales Tax and with the passage of the Sales Tax. <br />