Laserfiche WebLink
<br />~ <br />. <br /> M E M 0 RAN DUM <br />- July 5, 1985 <br /> TO: Mayor and City Council <br /> FROM: Mike Gleason, City Manager <br /> SUBJECT: FINANCING AIRPORT TERMINAL DESIGN <br /> At your June 3 work session on the Eugene Agenda, Councilors Hansen and Rutan <br /> suggested that work on the airport terminal design continue during the period <br /> that Council is seeking a capital financing source (July -- November, 1985). <br /> Completion of the design work will ensure that the project can go to bid <br /> within six months of assured financing, the cost estimates continue to be <br /> valid and the expenditures to date on the design are not lost due to <br /> design/cost obsolescence. Staff was asked to prepare an analysis of the cost <br /> to continue the design work and to propose a financing plan. <br /> Based on a workp1an prepared by the project team, $610,000 is reauired to <br /> complete the design development plan. The breakdown is as follows: <br /> Architectural fees and reimbursable expenses $445,700 <br /> Value engineering and architectura1/ <br /> engineering coordinator 20,000 <br />e Landside engineering 120,000 <br /> Landscape architecture 20,000 <br /> Administrative costs 4,300 <br /> TOTAL $610,000 <br /> The FAA has indicated it will commit $107,000 toward this effort, leaving a <br /> balance of $503,000 to be financed. Please note that the $610,000 will take <br /> the project to the end of the design phase ( a four-month effort) and that an <br /> additional $500,000-$600,000 will be reauired to complete the bid contracting <br /> documents. However, if financing for the project is obtained, the $17.1 <br /> million project cost includes the design/bid document preparation cost; and, <br /> thus, the expenditures for the design and bid documents can be repaid from the <br /> proceeds of the long-term financing. <br /> The Airport Fund does not have unobligated funds to finance the design nor are <br /> there other unobligated or unreserved sources of funds available. However, we <br /> do have Internal Service Funds with replacement reserves that can support an <br /> interfund loan to the Airport Fund. We are proposing an interfund loan from <br /> the Fleet Fund, using fleet replacement reserves as the source of funds. <br /> Fleet replacement reserves are dedicated to future replacement of vehicles and <br /> communications eauipment and are not currently reauired for expenditure. The <br /> interfund loan will be repaid as follows: <br />e <br /> . <br />