My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/04/1991 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1991
>
11/04/1991 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 10:28:13 PM
Creation date
11/2/2006 5:01:51 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
11/4/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e M I NUT E S <br /> Eugene City Council <br /> Work Session <br /> McNutt Room--City Hall <br /> November 4, 1991 <br /> 5:30 p.m. <br /> PRESENT: Roger Rutan, Shawn Boles, Ruth Bascom, Bobby Green, Randy <br /> MacDonald, Paul Nicholson, Kaye Robinette. <br /> ABSENT: Debra Ehrman. <br /> The meeting of the Eugene City Council was called to order by His Honor Mayor <br /> Jeff Mi 11 er . <br /> 1. STATE TRANSPORTATION PROGRAM UPDATE <br /> A. Status Report on Major State Transportation Projects <br /> David Reinhard, City Transportation Engineer, presented a general status <br />e report concerning several projects on the State highway system in Eugene that <br /> are in various stages of planning, design, or construction. He said most of <br /> the activity was on Eugene's west side. Projects underway include Highway 99 <br /> North, the West Eugene Parkway, and Beltline Road. Other Oregon Department <br /> of Transportation (ODOT) projects include the Harlow Road overpass at Inter- <br /> state 5, Franklin Boulevard, Ferry Street Bridge, and interstate highways 5 <br /> and 105. <br /> Mr. Reinhard introduced Les Lyle, City Engineer, to provide detailed informa- <br /> tion about the Highway 99 North and West Eugene Parkway projects. <br /> Highway 99 North. Mr. Lyle said the improvement on Highway 99 North is pro- <br /> ceeding in two phases. Phase 1, from Beltline Road to Barger Avenue, in- <br /> volves a pavement overlay and some minor widening. Phase 1 is scheduled for <br /> completion in summer 1992. Landscaping will be completed in 1993. <br /> Mr. Lyle said that Phase 2 will extend from Barger Avenue to Roosevelt Boule- <br /> vard. The final design is now underway and will include curbs and gutters, <br /> sidewalks, bike lanes, landscaping, improved traffic signals, lighting, and <br /> pavement overlay. Construction of this section should be completed in 1993. <br /> Mr. Lyle said that no firm concepts for landscaping designs have been devel- <br /> oped for the Highway 99 project. He said property owners along the Highway <br /> 99 corridor are concerned about how landscaping will be maintained. Mr. Lyle <br />e MINUTES--Eugene City Council November 4, 1991 Page 1 <br />- . ....-- .-- - ------ --- -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.