<br /> -.--.. Au:ount
<br /> Cost: to
<br /> K3~e of Biuder an1 Project Ccm'tract Cost 'Abutting Prop. C03t to Cit:y Bu:lgeted
<br /> -- '.._~-~- - -
<br /> . ...-.-.--- -- - .- -- .. .--. .,,~.
<br /> PAVING AND SIDEWALK: e
<br /> 4. A~'et from Cameo Street South
<br /> 110 et to existing curb .'
<br /> T1T62} ALJERNATE BID BASIC BID
<br /> 1. Wndi sh Cons'truction Company. ; .. ... .. .. ..'..,. ;. $ 27. ,845.25.,.. $ 27,849.55.... ..12' Pa\..... .:.$ 14.80/FF,.:....:.. Pav...; . $ 2,710.00...........0
<br /> 2. Eugene Sand & Gravel, Inc.....................$ 29,504.65...No Bid 14' Pav......$ 16.70/FF..........Storm...$ 2,750.00
<br /> 3. Shur-I~ay Contractors, Inc.............. ~.. ... . $ 37,696.44... $ 29.524.99 16' Pav...... $ 18. 65/FF
<br /> 4" Sidewa1k..$ -1.66f5.F
<br /> 5" Sidewa1 k..$ l.ltl tsF October 1, 1975,
<br /> COMPLETION DATE: --------------------------------------------------------~----------------------------------------------------------------------~---------------------
<br /> PAVING AND StORM SEWER:
<br /> 5. Rio Glen Drive trom DebriCkRoad to East
<br /> Boundary of Brickley-Elsey Gardens, Addition;
<br /> and A1faretta Drive from Rio Glen Drive
<br /> to East Boundary of Brickley-Elsey
<br /> Gardens Addition (1172) ALTERNATE BID BASIC BID
<br /> 1. Wildish Construction Company.......... .,...... .$36,308.71.... .$37.106.06...... .28' Pav......$ 16.20/FF................ ~; .0..................0
<br /> 2. Eugene Sand & Gravel, Inc...,.................$37,OB4.89.....No Bid Stm. Swr.....$738.00/Lot
<br /> 3. Babb Construction Company, dba .
<br /> Delta Construction Company..................No Bid.........$39,499.70 COMPLETION DATE: October 1. 1975
<br /> ----------------------------------------------------------------------:.~-~~--------------------------------------------------------------------------
<br /> SANITARY SHIER:
<br /> 6. To serve the Skyline Loop annexation area
<br /> generally bounded by 43rd Ave. on the North
<br /> Dillard Rd. on the South & West, and East of
<br /> Skyline Loop on the East (Phase I) (822)
<br /> 1. ~l1ldish Construction Company...........,........~.$ 64,243.00.~...............San. Swr. Lat....$ 0.08/SF................$ 2,450.00..........0
<br /> 2. Kenneth R. Bostick Construction Company..........$ 75,583.00.................San. Serv.......$240.00/Each
<br /> 3. Wick Bros. Excavation............................$ 86,967.89
<br /> 4. Dan D. Allsup, Contractor Inc....................$ 98,949.00 COMPLETION DATE: October 15, 1975
<br /> ----------------------------------------------------------------------------------------------------------------------------------------------------.
<br /> SANITARY SE'.-:ER: e
<br /> 7. Martin Street fro~ Center Way
<br /> to 500 feet \lest (822) .
<br /> 1. Kenneth R. Bostick Construction Co............$ 6,295.60.......................$ 0.084/SQ.Ft'.....................$ 580.00.....,..,.......0
<br /> 2. Dan D. Allsup ContraC'tor, Inc.................$ 6,535.28...
<br /> 3. Wildish Construction Company................,.~ 6,722.00
<br /> 4. Norm Green &.S9ns.............................~ 13,744.50 COMPLETION DATE: Septer~el" 15,19
<br /> 5. Shur-Way Coneractors, Inc....................., 8,819.42 ________________________________________________________________________
<br /> ----------------------------------------------------- .._--------------~-------
<br /> BICYCLE PATH:
<br /> 8. South bank of Wi11amette River from Briarci iff
<br /> Lane to Washington Street (954)
<br /> ALTnNATE BID BASIC BID
<br /> 1. Wildish Construction Company............... .No !lid:......... .$23,291.00............ .0............................ .$23,291.00....... .$30,000.OC
<br /> 2. Benge Paving, Inc......................... ..No [lid.......... .$24.452.50 ,
<br /> 3. Eugene Sand & Gravel, Inc...................No Bid...........$26,648.60
<br /> 4. Fred Stubbert...............................$52.371.65.......No Bid
<br /> COMPLETION DATE: October 1, 1975
<br /> ------~-----~-----------------------------------------.~--~---~----------~----~--------~----------------~---~-----------------------~---------------~_.
<br /> ....
<br /> Don Allen, public works director, reviewed the bids. He noted correction on Item 4
<br /> (Agate Street) changing estimated cost for 4" sidewalk to $1.37 per front foot, 5" sidewalk
<br /> to $1.51 per front foot. Letters of protest were noted on Item 3 (alley between Willamette
<br /> and Oak ftom 26th to the south). Contract award was recommended to the low bidder on each
<br /> project, except no recommendation was made at this time on Item 4.
<br /> Public hearing was opened. -
<br /> Item 3 - Paving alley between Willamette and Oak from 26th south
<br /> Bob Skopil, 370 Walnut Lane, and Carlene Belisle, 2640 Oak Street, objected to the
<br /> improvement. They saw no need for the paving saying it would provide an improved
<br /> alley parallel to an existing alley. They didn't feel obliged to pay for an improve-
<br /> ment to accommodate lease provisions for some other tenant.
<br /> ~ . . ,..
<br /> 8 /11/75 - 12 449.'