Laserfiche WebLink
<br /> -.--.. Au:ount <br /> Cost: to <br /> K3~e of Biuder an1 Project Ccm'tract Cost 'Abutting Prop. C03t to Cit:y Bu:lgeted <br /> -- '.._~-~- - - <br /> . ...-.-.--- -- - .- -- .. .--. .,,~. <br /> PAVING AND SIDEWALK: e <br /> 4. A~'et from Cameo Street South <br /> 110 et to existing curb .' <br /> T1T62} ALJERNATE BID BASIC BID <br /> 1. Wndi sh Cons'truction Company. ; .. ... .. .. ..'..,. ;. $ 27. ,845.25.,.. $ 27,849.55.... ..12' Pa\..... .:.$ 14.80/FF,.:....:.. Pav...; . $ 2,710.00...........0 <br /> 2. Eugene Sand & Gravel, Inc.....................$ 29,504.65...No Bid 14' Pav......$ 16.70/FF..........Storm...$ 2,750.00 <br /> 3. Shur-I~ay Contractors, Inc.............. ~.. ... . $ 37,696.44... $ 29.524.99 16' Pav...... $ 18. 65/FF <br /> 4" Sidewa1k..$ -1.66f5.F <br /> 5" Sidewa1 k..$ l.ltl tsF October 1, 1975, <br /> COMPLETION DATE: --------------------------------------------------------~----------------------------------------------------------------------~--------------------- <br /> PAVING AND StORM SEWER: <br /> 5. Rio Glen Drive trom DebriCkRoad to East <br /> Boundary of Brickley-Elsey Gardens, Addition; <br /> and A1faretta Drive from Rio Glen Drive <br /> to East Boundary of Brickley-Elsey <br /> Gardens Addition (1172) ALTERNATE BID BASIC BID <br /> 1. Wildish Construction Company.......... .,...... .$36,308.71.... .$37.106.06...... .28' Pav......$ 16.20/FF................ ~; .0..................0 <br /> 2. Eugene Sand & Gravel, Inc...,.................$37,OB4.89.....No Bid Stm. Swr.....$738.00/Lot <br /> 3. Babb Construction Company, dba . <br /> Delta Construction Company..................No Bid.........$39,499.70 COMPLETION DATE: October 1. 1975 <br /> ----------------------------------------------------------------------:.~-~~-------------------------------------------------------------------------- <br /> SANITARY SHIER: <br /> 6. To serve the Skyline Loop annexation area <br /> generally bounded by 43rd Ave. on the North <br /> Dillard Rd. on the South & West, and East of <br /> Skyline Loop on the East (Phase I) (822) <br /> 1. ~l1ldish Construction Company...........,........~.$ 64,243.00.~...............San. Swr. Lat....$ 0.08/SF................$ 2,450.00..........0 <br /> 2. Kenneth R. Bostick Construction Company..........$ 75,583.00.................San. Serv.......$240.00/Each <br /> 3. Wick Bros. Excavation............................$ 86,967.89 <br /> 4. Dan D. Allsup, Contractor Inc....................$ 98,949.00 COMPLETION DATE: October 15, 1975 <br /> ----------------------------------------------------------------------------------------------------------------------------------------------------. <br /> SANITARY SE'.-:ER: e <br /> 7. Martin Street fro~ Center Way <br /> to 500 feet \lest (822) . <br /> 1. Kenneth R. Bostick Construction Co............$ 6,295.60.......................$ 0.084/SQ.Ft'.....................$ 580.00.....,..,.......0 <br /> 2. Dan D. Allsup ContraC'tor, Inc.................$ 6,535.28... <br /> 3. Wildish Construction Company................,.~ 6,722.00 <br /> 4. Norm Green &.S9ns.............................~ 13,744.50 COMPLETION DATE: Septer~el" 15,19 <br /> 5. Shur-Way Coneractors, Inc....................., 8,819.42 ________________________________________________________________________ <br /> ----------------------------------------------------- .._--------------~------- <br /> BICYCLE PATH: <br /> 8. South bank of Wi11amette River from Briarci iff <br /> Lane to Washington Street (954) <br /> ALTnNATE BID BASIC BID <br /> 1. Wildish Construction Company............... .No !lid:......... .$23,291.00............ .0............................ .$23,291.00....... .$30,000.OC <br /> 2. Benge Paving, Inc......................... ..No [lid.......... .$24.452.50 , <br /> 3. Eugene Sand & Gravel, Inc...................No Bid...........$26,648.60 <br /> 4. Fred Stubbert...............................$52.371.65.......No Bid <br /> COMPLETION DATE: October 1, 1975 <br /> ------~-----~-----------------------------------------.~--~---~----------~----~--------~----------------~---~-----------------------~---------------~_. <br /> .... <br /> Don Allen, public works director, reviewed the bids. He noted correction on Item 4 <br /> (Agate Street) changing estimated cost for 4" sidewalk to $1.37 per front foot, 5" sidewalk <br /> to $1.51 per front foot. Letters of protest were noted on Item 3 (alley between Willamette <br /> and Oak ftom 26th to the south). Contract award was recommended to the low bidder on each <br /> project, except no recommendation was made at this time on Item 4. <br /> Public hearing was opened. - <br /> Item 3 - Paving alley between Willamette and Oak from 26th south <br /> Bob Skopil, 370 Walnut Lane, and Carlene Belisle, 2640 Oak Street, objected to the <br /> improvement. They saw no need for the paving saying it would provide an improved <br /> alley parallel to an existing alley. They didn't feel obliged to pay for an improve- <br /> ment to accommodate lease provisions for some other tenant. <br /> ~ . . ,.. <br /> 8 /11/75 - 12 449.' <br />