Laserfiche WebLink
<br /> B. Appeal from Planning Commission denial of modification of Coburg Plaza <br /> Development Plan to allow entertainment center (Ear I W. Green)(PD 73-1) <br /> e Applicant requested withdrawal of the appeal. There were no objections. <br /> C. Bids <br /> 1. Public Works Department (opened September 4,1975) <br /> -----...--- COlt to AIloun t <br /> ~"~ :.'~.!:~ri~~c-.:____ Contract Coat AbutUnl Prop. COlt to City Budgeted <br /> PI,V::;G. SMHTARY SHIER AND STORM SEWER: <br /> l. ~lilhfn Ren Plot and sanitary sewer 1n <br /> ..-oa 163 feel West of Clevehnd Street <br /> f.om 25th Avenue to South. and Lots 1. <br /> 2. 3 of Block 3, \~oodhaven Addition ALTERNATE BID BASIC BID <br /> :Iorth of 27th Avenue (1036) <br /> l. Dan 0 Allsup Contractor. Inc..........$60.642.26........No B1d...........28' Pav........$ 24.50/FF.....................O..................0....... <br /> 2. Eugen~ Sand & Gravel. Inc..............$67.621.74........No Bid San. Swr. lat..$ O.094/SF <br /> 3. Wl1dlsh Construction Company...........$68.390.55........$70.120.35 San. Service...$ 85.00/Each <br /> 4. Kenneth R. Bostick Construction Co.....$B9.974.76........NO Bid Stm. Sewer.....$128.00/lot <br /> COMPLETiON DATE: July 1. 1976 <br /> ........ -............ -.... --.. --.............. ....... --......... --.. -: -- --- ----................. -.. ......-- ........--.....---- ...... ----.. --...... ---- -- --.. ....--...... --.. ..............-..- -................ -..........................................- ..-...... <br /> SANITARY SEWER: <br /> 2. Oelta Iflghway from Belt Une Road to <br /> 2400 feet tlorth; and Green Acres Road <br /> frOM De' ta ~19hway to approximately <br /> 1500 feet Ea>t (666 & 1192) <br /> l. KeMelh R. Bostick Construction Co..........$101.415.55...................5an. Swr. lat...$0.0621SF...............$74.300.00...............0....... <br /> 2. Wildtsh .onstructlon Co~pony.............. ..$139.526.00 <br /> 3. Don D. Allsup Controctor. Inc...............$238.788.00 COMPLETION DATE: January 1. 1976 <br /> - -- - --...... ---.... -- --.. -- ---.... -.. --------.. ----.... ------ -...-....- ---....---....--........-..----......----..------..-..-..-.. ------- ..--....... -----'"'--- --- ---- -.. -- ....-.....-....--..---...---------.. <br /> , Highway 99N fro~ Side Street to <br /> 5eO feet South (1166) <br /> 1. If & J Co".structlon.......... ...............5 9,517.00....................5en. Swr. lat...$0.166/SF.....................0..................0....... <br /> 2. Shur-,:ay Contractors. Inc...................$10.559.05 Sen. Servtc.....531B.OD/EACH <br /> 3. nildish Construction Cc~peny............... .$10,736.00 <br /> 4. Kcn"cth R. eostick Construeiton Co..........$11.D43.50 <br /> 5. l. O. Van Over Constr~ction, Inc............$14,569.40 <br /> 6. D'n D. Allsup Conlractor, Inc...............$15.738.00 <br /> 7. Wick Brothers Excavetion. Inc...............$16.060.97 COMPLE'!':O~ OATE: November 1. 1975 <br /> -- -.. -.................................................... -................ --...................................... -- -..- --........ --..................-.. ~.... ","" ---..-........ --.... -- -., ---...... .... ...... -- -- ---...... --............................. .-----........-.... <br /> 4. To serve area b~tween 41st Avenue <br /> (extended) and 500 feet South of <br /> 41st Avenue (extended) and between <br /> East kazon Dr; ve and r;orth Shasta <br /> Leop (951 ) <br /> 1. Dan D. Allsup Contractor. Inc..................$ 8.679.60....................San. Swr. Lat....$0.065/SF...............0.................0.......... <br /> 2. Shur-Way Centractors. Inc......................$ 8.852.00 <br /> 3. Wll di sh Constructl on Company................... $1 0 .408.00 <br /> 4. L. D. Van Over Construction. Inc...............$12.152.oo <br /> S. H & J Construction........................... ..512.349.00 <br /> 6. Kenneth R. Bostick Construction CO.............514.778.80 COMPLETION OATE: Novelllber 15. 1975 <br /> . - - -..... -........ -.................... -................ -oo...... -...................._..................... ......_.... __......... __.... __ _.. 00"_.. __.. __ ___.............. __oo................ __........ __ __............ ___ __............... ___.......... __.... __.. __...... <br /> BICYCLE PATIf: <br /> 5. Along A~~zon Channel from Quaker Street <br /> to Cha:r:bers Street (1046 ) <br /> 1. \;i 1 d; sh Cons truc t 1 on Co"'pany................... $ 13.285.80.. . . .. .. . .. .. . .. . .. .. .. . .. . .. .. .. . .. .. . .., .. . . . . . . . . .. .. . . $ 13 ,285.80. .. . . .. $13.285.80. .. .. <br /> 2. Eugeoe Sand & Grevel. Inc......................$13.851.00 <br /> 3. Benge Paving. Inc...................... ...... ..517.9B7.91 COMPLETION DATE: October 15. 1975 <br /> .... .................................................. --........ ............................. -- -.... --.. --...... ----........... --...... _oo_.. -.. -- ----.... --.. -____.. _____........ __.................... ___...... __.... __ __.... __............ --00 ......___ __ ___ <br /> 6. Bet\'Jeen Marsha'l Avenue and Hawthorne <br /> Street from Taney Street to Hughes <br /> Street (1210) <br /> 1. Wi 1 di sh Cons truc t i on Company................... $ 5.708.00.......................................................... $5.708. DO.. .. . .. . $5. 70B. 00 <br /> 2. Eugene Sand & Gravel. Inc......................$ 6.603.00 <br /> 3. 6enge Paving. Inc..............................$ 7.558.06 COMPLETION OATE: October 15. 1975 <br /> .... ................ ~.. --........................................ --.......... ---........... --..................... --- ----- -.. ..---------.. -.. -...... --.. -..... -- --.... ..-..... .. -- ---...... -.... .... _oo __......... __.. _........ __..................... ..___ - __ - ___ <br /> 7. 5th Iovenue from High Street to 300 feet <br /> East (1l53) <br /> l. w; 1 d ish Cons truct I on Co~pany................. 5 3.469.50........................................................... $ 3.469.50......... $ 3 .~69. 50 <br /> 2. Benge Paving. Inc............................$ 4~493.75 . <br /> J. Eugone Sand & Grevel. Inc....................$ 5'.146.25 . <br /> COMPLETION DATE: November 1. 1 975 <br /> -: - - - - -.. - - - - - -....... - - - -----,-':" -- - -- -- --.. - -.. - -- - --.... - --- - ": - - - - ---... -- -- - - - - --- - - - - -- - --- --... -- - -- ---- -- -- -- -- -- - - --- - - - - -- -- - - - - -- -...- --- -...-.. -.... -.... -.. ...--..- - -.. - ---... <br /> '. ~ <br /> Don All en, public works director, reviewed the bids. Recommendation was to award con- <br /> . tracts to the low bidder on each of the projects, holding the one on Item 4 (sewer in <br /> 41st Avenue area between East Amazon and North Shasta) 4S days, as allowed within the <br /> bid proposa~ to permit acquisition of right-of-way from an out-of-state owner. Mr. <br /> Allen explained that the project covered by Item 2 (sewer on Delta Highway and Green <br /> Acres Road) was redesigned after being rejected on a previous bid call. The redesign <br /> incl uded the portion on Green Acres Road. With regard to the bicycle path items <br /> 491 9/8/75 - 3 <br />