My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2A: Approval of Minutes
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 06/13/05 Mtg
>
Item 2A: Approval of Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:30:40 PM
Creation date
6/9/2005 11:36:17 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Bettman referred to page 23 of the operating budget and suggested that, due to a decrease in <br />residential water use, the MWMC revenues also dropped, leading to the need for the rate increase. She <br />asked why, since the rates were intended to cover usage and flow, they did not go down when water use <br />went down. Mr. Ruffler indicated there was no correlation between less water usage and rates or linear <br />relationship in terms of wastewater treatment. Water is a carriage medium for wastewater, so while a <br />resident may use less water they were still contributing the same strength or even higher strength of waste, <br />causing treatment costs to remain relatively even. The portion of the plant's expenses affected by <br />conservation was pumping costs. Ms. Smith said that people would see some savings on the local side of <br />the bill, which was where the conveyance system was reflected. <br /> <br />Ms. Bettman determined from Mr. Ruffler that the positions in Public Works were reimbursed through the <br />MWMC. <br /> <br />Ms. Bettman asked how much the commercial rates were increasing. Mr. Ruffler said they were going up <br />six percent as well. <br /> <br />Ms. Bettman said her experience on the Public Works Rates Advisory Committee led her to believe that <br />there was considerable "wiggle room" in determining the capacity for new growth. She maintained that in <br />general, Eugene was in the lower third of Oregon cities in terms of recovering the costs of growth through <br />systems development charge (SDCs). Even if the SDC was consistent with the methodology, she <br />suggested it could correctly be stated that the community was not recovering the costs of growth because <br />staff could not develop a definitive allocation for SDCs. Ms. Smith said that the SDC methodology the <br />MWMC forwarded to the two councils followed the new statutes effective in 2003. Those statutes laid <br />out a procedure that required the commission to develop a project list. Every project on the list must be <br />allocated across all the process components and each had an allocation to growth. A great deal of analysis <br />of individual projects went in to determining what was needed for capacity for new growth. Ms. Smith <br />said the MWMC secured the best consultants it could to evaluate the projects for the specific new capacity <br />requirements for growth. There was no judgment call on the part of the commission to either lower the <br />SDC or avoid full cost recovery. The analysis done was a technically objective analysis. <br /> <br />Responding to a question from Mr. Pap6 about a proposed staffing shift, Mr. Ruffler said Eugene provided <br />both regional and local services and the cost of regional services were paid by the MWMC. Each year <br />staff looked back at the allocation of staff time and the projection for the next year, and adjusted the <br />funding percentages accordingly. Mr. Pap6 asked if the increased work load in bio solids management <br />could be addressed by the staffing increase proposed. Mr. Ruffler anticipated additional increases in <br />staffing as subsequent phases were added to the bio cycle farm project. Ms. Smith said the added staff <br />was also needed to empty and reline the lagoons on a more aggressive time line than originally foreseen. <br /> <br />At the request of Mr. Pap6, Ms. Smith reviewed the changes to the reserves. <br /> <br />Mr. Kelly asked if the SDC was covering the cost of growth. Ms. Smith said yes. <br /> <br />Responding to a question from Mr. Kelly about the status of the court case involving the MWMC <br />Facilities Plan, Ms. Smith said that the case was going to oral argument on May 16. Mr. Jewett said the <br />judge indicated it was his goal to have a decision by the end of June 2005. <br /> <br />MINUTES--Eugene City Council May 9, 2005 Page 5 <br /> Work Session <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.