Laserfiche WebLink
<br />Recommendation 1 <br /> <br />Recommend to the City Council that the conceptual approval of the perform- <br />ing arts center be reaffirmed, that final schematics be accepted and that ~ <br />HHPA be directed to begin design development using the following criteria: <br /> <br />1. The large hall shall have a minimum of 2200 seats. <br /> <br />2. The small hall shall have special attention to assure it will <br />work for the local users by using the following guidelines: <br /> <br />A minimum of 500 seats <br />Primarily frontal <br />Mainly for speech <br />End stage/non proscenium <br />Audience in the same room with performer <br />Flexibility means; quick and easy turnover and a variety <br />of performance types <br /> <br /> a. <br /> b. <br /> c. <br /> d. <br /> e. <br /> f. <br />3. The <br /> <br />parking structure is to accommodate a minimum of 225 cars. <br /> <br />4. That the Master Site Plan be adopted for the west block and that <br />staff be directed to initiate the vacation of Willamette Street. <br /> <br />5. That concerns relating to functional and operational details <br />be resolved thru design. <br /> <br />And further, that these recommendations are contingent upon the City <br />Council authorizing additional funds to accomplish these goals. <br /> <br />Recommendation 2 <br /> <br />- <br /> <br />Recommend to the City Council that additional funds are necessary to: <br /> <br />- Ensure that the high quality of materials and technique in construc- <br />tion are maintained. <br /> <br />- Ensure that the facilities are functionally complete and that they <br />meet the original program concepts. <br /> <br />Provide basic construction for spaces which require future funding <br />from other sources. <br /> <br />And further, that the funds required to accomplish these goals be priori- <br />tized as follows: <br /> <br />1. Allocate $1,814,200 to complete the program as based upon the <br />original concepts. <br /> <br />2. Allocate $115,000 for the installation of an orchestra lift in <br />the 1 arge ha 11 . <br /> <br />3. Allocate $169,600 for the construction of a "shell only" rehearsal <br />hall and circulation space. <br /> <br />- <br /> <br />4/9/79--4 <br /> <br />\<15 <br />