Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />Mr. Lieuallen noted, regarding Item 1-0-2, working with the County on securing <br />Chambers connector, that he had thought the City was beyond the discussion <br />stages with the County and Mr. Allen responded that Lane County is the lead <br />agency on this. Mr. Lieuallen then wanted to know when the Connector miqht be <br />secured. Mr. Allen responded that the dates have been established in the T-2000 <br />plan. However, funding has not been secured. Mr. Lieuallen asked what was <br />being done to pursue this with the County and to clarify tarqet dates. Mr. <br />Allen responded that meetings between staff and the technical committee are <br />occurring. They are attempting to establish timing issues on how to include <br />them in TIP, etc. No specific date for construction has been set. <br /> <br />Mr. Lieuallen asked, regarding Items II-A, 1, 2, and 3, the EEDC, at what point <br />EECD will bring the council a recommendation. Ms. Miller responded he would be <br />recelvlng a memo. Mr. Lieuallen asked if that would include policy recommenda- <br />tions and Mr. Henry answered that it would. Ms. Miller stated that the specific <br />recommendations on the easy questions will be included. However, they are <br />somewhat vague on the more definite issues. Mr. Lieuallen commented he did not <br />remember discussing the Airport fire station. Mr. Henry responded that it was <br />required by the FAA and would be built at the expense of the airlines. <br /> <br />V. CONDEMNATION AUTHORIZATION <br />(Memo and Map distributed) <br /> <br />Mr. Henry referred to the map and stated this condemnation would include that <br />area within the heavy blackened lines. The rest will be either across Park land <br />or along roadways and some area within H-J is involved. The reason for this <br />large an area is that the trench will be very wide. It could be as wide as 50 <br />feet in some places. It will be under construction this summer with MWMC doinq <br />the construction and the City doing the engineering and land acquisition. He <br />further stated we need to acquire this land as soon as possible. <br /> <br />Mr. Delay noted that a lot of City effort and funding is going into this project, <br />including surveying, and asked if this is being billed back to MWMC. Mr. Henry <br />responded that it is. Mr. Delay asked what happens when they get to the river. <br />Bert Teitzel, Public Works, stated they would be going either under or over the <br />river and may put in another bike bridge. <br /> <br />CB 2099--An ordinance authorizing the institution of proceedings in <br />eminent domain for the acquisition by condemnation of property to <br />acquire permanent sanitary sewer easement and temporary construc- <br />tion easement for the East Bank Interceptor sewer from existing <br />Springfield treatment plant to proposed regional treatment plant <br />and to acquire fee simple title for expansion of the Wi1lakenzie <br />sanitary sewer pump station, and declaring an emergency. <br /> <br />Ms. Smith moved, seconded by Mr. Lieuallen, that the bill be read <br />the second time by council bill number only, with unanimous <br />consent of the council, and that enactment be considered at this <br />time. Roll call vote; motion carried unanimously, and the bill <br />was read the second time by council number only. <br /> <br />3/12/80--7 <br />