My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/13/1981 Meeting (2)
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1981
>
07/13/1981 Meeting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2007 1:35:12 AM
Creation date
11/2/2006 5:47:07 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
7/13/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> DEPARTMENT OF PUBLIC WORKS <br /> <. . <br /> . Engineering Division <br /> BlOND.: 4 <br /> e Opened: July 7, 1981 <br /> l. PAVING, SANITARY SEWER AND SIDEWALK on Bailey Hill Road from Warren Street <br /> to Bertelsen Road and sanitary sewer in Four Oaks Grange Road from Bailey <br /> Hill to approximately 500 feet north (Job No. 1576) <br /> Contract Cost <br /> Bidders Basic Alternate <br /> 1. Eugene Sand & Gravel ------------------ $296,717.36 $ 0 <br /> 2. Wildish Construction Co. -------------- $303,697.57 $299,530.26 <br /> 3. Morse Bros. Contractors, Inc. --------- $324,303.95 $ 0 <br /> 4. H & J Construction Co. ---------------- $333,167.05 $ 0 <br /> Cost to Abutting Property Cost to City Amount Budgeted <br /> 20-Foot Paving $24. 35/FF $ 17,000 $ 84,700 (331) <br /> 28-Foot Paving $29.30/FF $170,300 County <br /> 36-Foot Paving $35.20/FF Cost to County <br /> 5 -Foot Sidewalk $ 7.10/FF <br /> 5 -inch Cone. Drive $ 1. 95/Sq. Ft. $165,500 <br /> 7 -inch Cone. Drive $ 2. 25/ Sq . Ft . <br /> A. C. Dr. $ 0.85/Sq. Ft. <br /> San. Lat. $ 0.20/Sq. Ft. <br /> San. Servo $460.0D/Each <br /> e COMPLETION DATE: October 31", 1981 <br /> ---------------------------------------------------------------------------------------- <br /> 2. PAVING, SANITARY SEWER AND SIDEWALK within and adjacent to Chippendale Sub- <br /> division; and storm sewer 650 feet north of Harlow Road from Arcadia Drive <br /> to Calvin Street; and storm sewer 1450 feet north of Harlow Road from Arcadia <br /> Drive to 300 feet east (Job No. 1712) <br /> Contract Cost <br /> Bidders Basic Alternate <br /> l. Wildish Construction Co. -------------- $233,037.52 $ 0 <br /> 2. H & J Construction Co. ---------------- $235,250.19 $ 0 <br /> 3. Kenneth R. Bostick Construction Co. --- $248,982.34 $ 0 <br /> 4. Eugene Sand & Gravel ~----------------- $253,369.25 $ 0 <br /> 5. Dan D. Allsup Contractor, Inc. -------- $260,170.26 $ 0 <br /> 6. Morse Bros. Contractors, Inc. --------- $264,854.00 $ 0 <br /> Cost to Abutting Property Cost to City Amount Budgeted <br /> 28-Foot Paving $26.20/FF $16,700 -0- <br /> San. Lat. $ D.10/Sq. Ft. <br /> San. Servo $175.00/Each <br /> Storm Sewer $ O.ll/Sq. Ft. <br /> -- Pedway $35.60/Lot <br /> Storm Sewer Direct $27,400.00 <br /> COMPLETION DATE: October 1, 1981 Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.