My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Agenda Packet 05-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
05-14-2018
>
CC Agenda Packet 05-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:02:38 PM
Creation date
5/11/2018 2:01:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Reserves <br />CAPITAL RESERVES <br />The MWMC Capital Budget includes four reserves: the Equipment Replacement Reserve, SDC <br />Reimbursement Reserves, SDC Improvement Reserves, and the Capital Reserve. These reserves <br />accumulate revenue to help fund capital projects including equipment replacement and major <br />rehabilitation. They are funded by annual contributions from user rates, SDCs, and loans. Each <br />reserve is explained in detail below. <br />EQUIPMENT REPLACEMENT RESERVE <br />The Equipment Replacement Reserve accumulates replacement funding for three types of <br />equipment: 1) major/stationary equipment items costing less than $200,000 with useful lives of <br />20 years or less; 2) fleet vehicles maintained by the Eugene Wastewater Division; and 3) <br />computer servers that serve the Eugene Wastewater Division. Contributions to the Equipment <br />Replacement Reserve in the FY 18-19 budget total $1,000,000, additional budget details are <br />provided below. <br />The Equipment Replacement Reserve is intended to accumulate funds necessary to provide for <br />the timely replacement or rehabilitation of equipment, and may also be borrowed against to <br />provide short-term financing of capital improvements. An annual analysis is performed on the <br />Equipment Replacement Reserve. The annual contribution is set so that all projected <br />replacements will be funded over a 20-year period and at the end of the 20-year period, the <br />reserve will contain replacement funds for all equipment projected to be in use at that time. <br />Estimates used in the analysis include interest earnings, inflation rates and useful lives for the <br />equipment. <br />PROPOSED <br />ADOPTEDAMENDED <br />BUDGETBUDGETBUDGET <br />EQUIPMENT REPLACEMENT RESERVEFY 17-18FY 17-18FY 18-19 <br /> Beginning Balance$11,737,145$11,822,589$12,007,589 <br /> Annual Equipment Contribution850,000850,0001,000,000 <br /> Interest50,00050,00030,000 <br /> Equipment Purchases(715,000)(715,000)(649,000) <br />Equipment Replacement Reserve $11,922,145$12,007,589$12,388,589 <br />SYSTEM DEVELOPMENT CHARGE (SDC) RESERVES <br />SDCs are required as part of the MWMC IGA. They are connection fees charged to new users to <br />recover the costs related to system capacity, and are limited to funding Capital Programs. The <br />purpose of the SDC Reserves is to collect and account for SDC revenues separately from other <br />revenue sources, in accordance with Oregon statutes. The Commission’s SDC structure includes <br />a combination of “Reimbursement” and “Improvement” fee components. Estimated SDC <br />revenues for FY 18-19 are approximately $1,735,000. Budgeted expenditures include <br />$2 millionfrom Improvement Fees to fund portions of the annual debt service payments on the <br />2016 revenue bonds. The projected beginning SDC Reserve balance on July 1, 2018 is <br />$4,622,481. <br />Page 21FY 18-19 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.