Laserfiche WebLink
<br />(4) The proposed zone" change is consistent with the applicable siting requirements set out <br />for the specific zone in: (a) EC 9.2150 Commercial Zone Siting Requirements. <br /> <br />F or this proposed zone change, there are no applicable siting requirements as referenced in the above <br />criterion. The commercial zone siting requirements at EC 9.2150 only affect properties proposed for C- <br />1 or C-4 zoning. There are no siting requirements in the Eugene Code for the Nodal Development/ND <br />overlay zone. <br /> <br />(5) In cases where the NR zone is applied based on EC 9.2510(3), theproperty owner shall <br />enter into a contractual arrangement with the city to ensure the area is maintained as a <br />natural resource area for a minimum of 50 years. <br /> <br />The above criterion is not applicable, as the proposed zone change does not include application of the <br />NR zone. <br /> <br /> <br />