My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: PH on Ordinance Regarding State Motor Pool Metro Plan Amendment and Zone Change
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 11/20/06 Public Hearings
>
Item 3: PH on Ordinance Regarding State Motor Pool Metro Plan Amendment and Zone Change
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:03 PM
Creation date
11/16/2006 10:45:33 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/20/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'; 1 <br /> <br />zoning continues from the site's earlier use and the former industrial nature of <br />this area. Presently, the only other industrially Plan designated or zoned <br />parcels in ~is area are the EWEB property to the east, across High Street,and <br />a small tax lot northwest of the subject site; Other than the EWEB property, <br />the site is surrounded by properties zoned S-F, Fifth Avenue Special Area Zone. . <br />On the north and west side, adjacent properties are In office use. The railroad <br />tracks border the property. on the south, with the 5th Street Market ~ <br />development further to the south. <br /> <br />. As indicated above, the' Metro Plan Diagram designates this site <br />HDR/MU IND. The basis for thi& classification i~ unclear but it'is noted that <br />properties north of 4th Ave~ue are within the Whiteaker Plan area and are <br />design~ted for Mixed Use." <br /> <br />'The applicable refinement plan is the Eugene Downtown Plan, adopted <br />April 12, 2004. In adopting that plan, the Eugene Planning Commission and <br />City Council did not alter the Metro Plan I?iagram with the exception of placing <br />the Nodal Development overlay on the Downtown. Plan area and changing the <br />land use designation. of the. Courthouse District from Industrial to Commercial <br />designation. While the Downtown Plan Diagram wa,s not altered to a great . <br />degree, the text of the Downtown Plan was completely revised, including <br />adoption of.a number of specific policies to. guide development in the downtown <br />area. <br /> <br />As indicated at page 1 of the Eugene Downtown Plan, the "central <br />them.es" of.the Plan were to reinforce downtown as a strong" regional center and <br />strengthen downtown as a cultural center, a center o('community life. <br /> <br />Chapter II of the Plan, 'entitled"Building .a Dowhtown,>> contains a <br />'section,. "Facilitating Development," where" it is stated: <br /> <br />~... All zoning regulations for downtown sho~ld be reviewed.to look <br />for ways to simplify and expedite development downtown. In " <br />,addition there are underused and vacant sites throughout <br />downtown. Some of these parcels are not designated for <br />commercial"use in the Metro Plan, or are designated commercial <br />but not commercially zoned. These sites, which include surface <br />parking lots doWntown, need to be redesignate~ or. rezoned ~o a1lo~ <br />for the commercial development envisioned in t~is plan." (p. 13) <br /> <br />Consistent with 'this statement, the Plan adopts as a Policy the following: <br /> <br />"3. Facilitate dowri.town developmentby.re-designating and <br />'rezoning underutilized properti~s, such as surface parking lots, to <br />a commercia11and use designation and a commercial zone such as <br />C-2 orC-3." (p. 14) <br /> <br />WRITTEN STATEME~T IN SUPPORT OF THE METROPOLITAN PLAN AMENDMENT APPLICATION, <br />STATE OF OREGON MOTOR POOL SITE - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.