Laserfiche WebLink
an underlying perforated pipe, a flush concrete edge, and a setback sidewalk. The <br /> effectiveness of a street sweeper cannot be addressed by an additional design feature <br /> in a curbless street design. <br /> <br />4. How did the staff arrive at the cost estimate of $240,000 for the context sensitive <br /> design process? <br /> <br />The cost estimate includes the following three elements: <br /> · Surveying $40,000 <br /> · Design $115,000 <br /> · Public Outreach $85,000 <br /> <br />The preliminary design would include the details of the proposed street from one end to the other <br />and for each individual property. The sections of Crest, Storey and Friendly to be part of the <br />preliminary design total approximately 6,880 feet in length. <br /> <br /> L:\CMO\2005 Council Agendas\M050629\S050629B-attB.doc <br /> <br /> <br />