My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Agenda Packet 05-30-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
05-30-2018
>
CC Agenda Packet 05-30-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 12:51:03 PM
Creation date
5/29/2018 12:50:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERMEDIATE PROJECT DELIVERABLES <br />Public Engagement <br />Materials, Activities Implementation of public engagement plan and documentation Gershow/ <br />and Summaries ongoing of results, compiled as a series of public engagement summaries Stuart/PMT <br />Gershow/ <br />Update of the Envision Eugene Land Sufficiency Model to O <br />Land Need determine land need projections for 10-30 years beyond the Consultants/ <br />Projections Report July 2018 2032 UGB PMT <br />Determination of study area size necessary for evaluation of <br />Urban Reserve land for possible inclusion in urban reserves, based on land need Gershow/ <br />Study Area Map August 2018 projections Evans/PMT <br />Collect/update and refine relevant study area data, including but Gershow/ <br />Study Area Data Summer-Fall not limited to GIS layers, wetland determination, infrastructure Consultants/ <br />Bank 2018 costs and serviceability Evans/PMT <br />Draft Winter Develop a preliminary analysis of how much, and where, future <br />Urban Reserve 2019; growth can best be accommodated within the study area. Gershow/ <br />Study Area Refinement Evaluate the study area for inclusion in urban reserves Consultants/ <br />Evaluation Report Spring 2019 consistent with the OAR and Goal 14 Evans/PMT <br />Draft <br />Sum. 2019; Develop two or more growth scenario alternatives for urban Gershow/ <br />Urban Reserve refinement reserves based on between 10 and 30 years of land needs from Evans <br />Options Fall 2019 2032 PMT <br />Draft Urban Reserve Draft proposal for Urban Reserve Area based on above analysis <br />Proposal Nov 2019 and input to Eugene and County Planning Commissions Gershow/ PMT <br />Gershow/ <br />Draft Service County <br />Provider Agreement Draft service provider agreement points re: sewer, water, fire staff/Service <br />Points Nov 2019 protection, parks, transportation and storm water Providers/PMT <br />FINAL DELIVERABLES <br />Provide materials necessary for Eugene City Council and Lane <br />County Board of Commissioners direction to staff on a preferred Gershow/ <br />Urban Reserve January urban reserve timeframe and area, and preparation of an Stuart/ County <br />Proposal 2020 adoption package. Staff/PMT <br />Gershow/ <br />County <br />/Service <br />Urban Reserve IGAs Fall 2020 Final service provider intergovernmental agreement(s) Providers/PMT <br />Gershow/ <br />Provide materials necessary for adoption of Urban Reserves Stuart/Jerome <br />Urban Reserve Fall Ordinance and by the Eugene City Council and Lane County / County Staff/ <br />Adoption Package 2020 Board of Commissioners PMT <br />Delivery of materials After local <br />for DLCD action is Provide materials necessary for acknowledgement of Urban Gershow/ <br />Acknowledgement taken Reserve Area by the state Jerome <br />8 | Page <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.