Laserfiche WebLink
2017 Report to the Citizen Street Repair <br />Review Panel <br />TABLE OF CONTENTS <br />INTRODUCTION ............................................................................................................. 1 <br /> <br />CRITERIA FOR PROJECT SELECTION AND SCHEDULING ...................................... 3 <br /> <br />FUNDING STATUS AND FORECAST ........................................................................... 7 <br /> <br />STND <br />1 AVENUE AND 2 AVENUE PAVING ................................................................... 10 <br /> <br />TH <br />30 AVENUE PAVING ................................................................................................ 11 <br /> <br />BEST LANE AND IONE AVENUE................................................................................ 12 <br /> <br />CALVIN STREET, LEIGH STREET, LYDICK WAY, PIONEER COURT, SATRE <br />STREET, TOMAHAWK LANE, AND WESTERN DRIVE ............................................. 13 <br /> <br />EAST AMAZON DRIVE PAVING ................................................................................. 15 <br /> <br />JEFFERSON STREET PAVING ................................................................................... 16 <br /> <br />2017 PEDESTRIAN AND BICYCLE IMPROVEMENT PROJECTS ............................. 17 <br /> <br />APPENDIX B (MAP OF BOND PROJECTS, BY NUMBER) ........................................ 20 <br /> <br />APPENDIX C (PROJECTS FOR PEOPLE WHO WALK AND BIKE) .......................... 23 <br /> <br />APPENDIX D (REPORT OF THE INDEPENDENT AUDITOR) .................................... 28 <br /> <br />th <br />Cover photos from 2017 projects: Completed 30 Ave paving at night (left); Completed Paving on E. Amazon (upper <br />th <br />right); Striping changes on 24 Ave (lower right) <br />2016 Report to the SRRP Page i <br /> <br />