Laserfiche WebLink
th <br />30 Avenue Paving <br />Project Description: This project consisted of rehabilitation of one street in the Southeast <br />Neighbors neighborhood in Council Ward 2: <br />th <br />30 Avenue from the Spring Blvd Overpass to Agate Street <br />· <br />Treatment Methodology: <br />th <br />30 Avenue was rehabilitated by removing and replacing the worn layers of existing <br />· <br />pavement. The pavement rehabilitation depth varied between 2 inches and 7 inches. The <br />entire road width also received a 2 inch pavement overlay. <br />Costs: Total project costs, from all funding sources, are estimated at $525,887. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $2,871,000 <br />$525,887 <br />Total Projected/Actual Paving Bond Funds Used = <br />$2,345,113 <br />Difference = <br />During design, it was found that the existing roadway could be rehabilitated and meet City design <br />standards for significantly less cost than the originally anticipated reconstruction treatment. <br />Additional Sources of Funding: None <br />Project Photos <br />Completed 30th Ave Paving <br /> Aerial view of completed paving on 30th Ave <br />2017 Report to the SRRP Page 11 <br /> <br />