My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 3-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
03-14-2018
>
Agenda Packet 3-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:15:10 PM
Creation date
6/4/2018 4:14:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Faulting:Faulting is the difference in elevation across the slab. One side may be leaning <br />up more over the other side. Causes are soft foundations, heavy traffic, poor construction, <br />and environmental damage. <br />How Pavement Management System Information is Used <br />The primary purpose of maintaining a PMS is to collect and analyze information relating to <br />street system condition and deterioration trends. With this vital information public works <br />managers ensure the most cost-effective maintenance or rehabilitation strategies are identified <br />and performed at the optimum time. <br />Each year the PMS is used to generate several reports requested by other agencies as well as <br />statistical data requested within our own agency. The following is a sample of reports produced <br />with PMS data: <br />Pavement Preservation Project List <br />Crack Seal Program <br />Five-Year Surface List five-year moratorium for street cutting <br />ODOT Oregon Mileage Report <br />City of Eugene Public Infrastructure Table <br />Annual Insurance Marketing Report <br />Transportation Service Profile <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.