My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 3-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
03-14-2018
>
Agenda Packet 3-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:15:10 PM
Creation date
6/4/2018 4:14:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Off-StreetShared-Use Paths <br />Shared-use paths are used by a variety of non-motorized users including; pedestrians, cyclists, <br />skaters, and runners. Shared-use paths are typically wider than an average sidewalk and paved <br />(asphalt or concrete). <br />There are approximately 45 miles of shared-use paths within UGB. In 2017, staff rated 45miles <br />of shared-used paths. In 2015 approximately 30 miles of shared-use paths were in a PCI <br />condition of 90 or above. In 2017 this dropped to 23 miles. <br />The City standards for shared-use paths require a concrete structure no less than six inches deep <br />and 12 feet wide. Paths designed, constructed or reconstructed to current standards are expected <br />to have a 50 year life. <br />Of the $51.2 million 2017 bond, $5 million will go towards pedestrian and bicycle infrastructure, <br />and safety improvements. <br />24 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.