Laserfiche WebLink
Scheduled Street Projects for 2018 <br />Lane <br />2018 Project Name and LimitsFunding <br />Miles <br />7th Place (7th Ave/Hwy 99 to Bailey Hill Rd) 4.01 PBM <br />11th Avenue (Danebo St to Bertelsen Rd) 5.05 LGT <br />30th Avenue (Willamette St to Ferry St) 0.69 PBM <br />Buff Way (Woodside Dr to Forrester Wy) 0.28 PBM <br />Carmel Avenue (Minda Dr to 400' S. of Minda Dr) 0.21 PBM <br />Cody Avenue (Golden Gardens to Blue Heron) 3.10 PBM <br />Corydon Street (Forrester Way to Tandy Turn) 2.30 PBM <br />Danebo Ave (Cody to Burnett) 0.44 LGT <br />Forrester Way (Coburg Rd to Drwy 1033) .039 PBM <br />Garfield Street (Roosevelt Blvd to 6th Ave) 2.30 PBM <br />Larkspur Avenue (Norkenzie Rd to 640' W of Norkenzie <br />0.33 PBM <br />NNorkenzie Rd) <br />Larkspur Loop (Norkenzie Rd (N) to Norkenzie Rd (S)) 0.61 PBM <br />Mill Street (30th Ave (N) to 30th Ave (S)) 0.05 PBM <br />Piper Lane (Chasa St to Fir Acres Dr) 0.31 PBM <br />Roland Way (Oakway Rd to Cal Young Rd) 0.334 PBM <br />Sharon Way (Coburg Rd to Drwy 1023) 0.60 LGT <br />Tulip Street (Crescent Ave to Holly Ave) 0.19 LGT <br />West Amazon Drive (Hilyard St to Fox Hollow Rd) 2.01 LGT <br />Willamette Street (23rd Ave to 29th Ave) 1.36 LGT <br />Woodside Drive (Cal Young Rd to Sharon Wy) 0.56 LGT <br />Project Funding Abbreviations <br />PBM Paving Bond Measure <br />LGT Local Gas Tax/SDC/Other <br />27 <br /> <br />