My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 4-16-18 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
04-16-2018
>
Agenda Packet 4-16-18 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:21:38 PM
Creation date
6/4/2018 4:21:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017 Report to the Citizen Street Repair <br />Review Panel <br />TABLE OF CONTENTS <br />INTRODUCTION ............................................................................................................. 1 <br /> <br />CRITERIA FOR PROJECT SELECTION AND SCHEDULING ...................................... 3 <br /> <br />FUNDING STATUS AND FORECAST ........................................................................... 7 <br /> <br />STND <br />1 AVENUE AND 2 AVENUE PAVING ................................................................... 10 <br /> <br />TH <br />30 AVENUE PAVING ................................................................................................ 11 <br /> <br />BEST LANE AND IONE AVENUE................................................................................ 12 <br /> <br />CALVIN STREET, LEIGH STREET, LYDICK WAY, PIONEER COURT, SATRE <br />STREET, TOMAHAWK LANE, AND WESTERN DRIVE ............................................. 13 <br /> <br />EAST AMAZON DRIVE PAVING ................................................................................. 15 <br /> <br />JEFFERSON STREET PAVING ................................................................................... 16 <br /> <br />2017 PEDESTRIAN AND BICYCLE IMPROVEMENT PROJECTS ............................. 17 <br /> <br />APPENDIX B (MAP OF BOND PROJECTS, BY NUMBER) ........................................ 20 <br /> <br />APPENDIX C (PROJECTS FOR PEOPLE WHO WALK AND BIKE) .......................... 23 <br /> <br />APPENDIX D (REPORT OF THE INDEPENDENT AUDITOR) .................................... 28 <br /> <br />th <br />Cover photos from 2017 projects: Completed 30 Ave paving at night (left); Completed Paving on E. Amazon (upper <br />th <br />right); Striping changes on 24 Ave (lower right) <br />2016 Report to the SRRP Page i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.