My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 4-16-18 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
04-16-2018
>
Agenda Packet 4-16-18 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:21:38 PM
Creation date
6/4/2018 4:21:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For the streets scheduled for 2017 construction, the 2012 estimated cost with inflation was <br />$9,383,000. As of January 3, 2018, although not all project contracts have been closed out, the <br />projected actual cost for the 2017 bond projects is $7,656,000; a net difference of $2,088,000 <br />below the costs projected in 2012. We have continued to see a steady increase in construction <br />costs but not to the degree that we originally projected resulting in a large remaining balance. We <br />expect this trend to continue through the last year of this Bond. Details on an annual project-by- <br />project basis are provided in the following pages and summarized in Appendix A. As construction <br />is completed each year, Appendix A will be updated and included in future reports to track the <br />funding status of the overall bond funds. <br />The 2012 bond measure also allocated an average of $516,000 for pedestrian and bicycle <br />improvements each year. In 2017, the project expenditures on all pedestrian and bicycle <br />improvements funded by the bond are estimated at $297,000. Due to expenditures to date, <br />approximately $200,000 is available for the final year of the Bond. <br />2017 Report to the SRRP Page 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.