My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 4-16-18 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
04-16-2018
>
Agenda Packet 4-16-18 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:21:38 PM
Creation date
6/4/2018 4:21:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Best Lane and Ione Avenue <br />Project Description: This project consisted of rehabilitation of two streets in the Harlow <br />Neighborhood in Council Ward 4: <br />Best Lane from Willakenzie Road to Kentwood Drive <br />· <br />Ione Avenue from Best Lane to Adkins Street <br />· <br />Treatment Methodology: <br />Best Lane was rehabilitated by removing and replacing the existing 6 asphalt surfacing. <br />· <br />Ione Street was rehabilitated by removing and replacing the top layer of worn asphalt <br />· <br />surfacing. The roadway also received a 2 pavement overlay. <br />Costs: Total project costs, from all funding sources, are estimated at $375,058. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $234,000 <br />$351,303 <br />Total Projected/Actual Paving Bond Funds Used = <br />$(117,303) <br />Difference = <br />Additional Sources of Funding: Stormwater and wastewater utility funds and EWEB funds. <br />Project Photos: <br /> Completed Paving on Best Lane Completed Paving on Ione Avenue <br />2017 Report to the SRRP Page 12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.