Laserfiche WebLink
<br />CITY OF EUGENE <br />TRANSPORTATION SDC PROJECT PLAN, 2018 <br />2035 TRANSPORTATION SYSTEM PLAN (TSP) PROJECT LIST <br />TSP <br />No. Project Name <br />Multimodal Projects <br />Upgrade Bertelsen from 18th <br />MM-16 Ave. to Bailey Hill Rd. 20-yr $3,900,000 $500,000 $3,400,000 40% $1,375,511 $0 $1,375,511 35% <br />Upgrade Bethel from <br />MM-13 Highway 99 to Roosevelt 20-yr $11,800,000 $1,800,000 $10,000,000 37% $3,653,925 $0 $3,653,925 31% <br />Upgrade the North/South <br />MM-12 section of County Farm Loop 20-yr $4,400,000 $400,000 $4,000,000 23% $929,455 $0 $929,455 21% <br />Upgrade W 11th from Terry <br />MM-14 to Green Hill 20-yr $12,300,000 $1,100,000 $11,200,000 23% $2,527,280 $0 $2,527,280 21% <br />Upgrade Hunsaker <br />MM-11 Ln/Beaver St. 20-yr $9,300,000 $1,100,000 $8,200,000 33% $2,668,191 $0 $2,668,191 29% <br />Upgrade Jeppesen Acres <br />MM-15 (Gilham to Providence) 20-yr $3,900,000 $400,000 $3,500,000 26% $900,000 $0 $900,000 23% <br />Multimodal—Other Projects <br />Reconstruct Franklin Blvd. as <br />a multi-way boulevard <br />MM-19 between Walnut and Onyx 20-yr $27,700,000 $2,100,000 $25,600,000 23% $5,893,142 $0 $5,893,142 21% <br />Add lanes on the Randy <br />Pape Beltline from Roosevelt <br />to W 11th, intersection <br />MM-20 improvements 20-yr $28,100,000 $7,500,000 $20,600,000 34% $6,923,236 $0 $6,923,236 25% <br />Widen Barger Dr. to provide <br />a second through lane in <br />MM-21 each direction 20-yr $1,900,000 $700,000 $1,200,000 4% $48,336 $0 $48,336 3% <br />Convert 8th Ave. to 2-way <br />MM-22 street 20-yr $3,900,000 $1,800,000 $2,100,000 4% $87,027 $0 $87,027 2% <br /> <br /> <br />June 13, 2018, Work Session - Item 1 <br />A-2 <br /> <br />