<br />Multimodal Projects
<br />Upgrade Bertelsen from 18th
<br />MM-16 Ave. to Bailey Hill Rd. 20-yr $3,900,000 $500,000 $3,400,000 40% $1,375,511 $0 $1,375,511 35%
<br />Upgrade Bethel from
<br />MM-13 Highway 99 to Roosevelt 20-yr $11,800,000 $1,800,000 $10,000,000 37% $3,653,925 $0 $3,653,925 31%
<br />Upgrade the North/South
<br />MM-12 section of County Farm Loop 20-yr $4,400,000 $400,000 $4,000,000 23% $929,455 $0 $929,455 21%
<br />Upgrade W 11th from Terry
<br />MM-14 to Green Hill 20-yr $12,300,000 $1,100,000 $11,200,000 23% $2,527,280 $0 $2,527,280 21%
<br />Upgrade Hunsaker
<br />MM-11 Ln/Beaver St. 20-yr $9,300,000 $1,100,000 $8,200,000 33% $2,668,191 $0 $2,668,191 29%
<br />Upgrade Jeppesen Acres
<br />MM-15 (Gilham to Providence) 20-yr $3,900,000 $400,000 $3,500,000 26% $900,000 $0 $900,000 23%
<br />Multimodal—Other Projects
<br />Reconstruct Franklin Blvd. as
<br />a multi-way boulevard
<br />MM-19 between Walnut and Onyx 20-yr $27,700,000 $2,100,000 $25,600,000 23% $5,893,142 $0 $5,893,142 21%
<br />Add lanes on the Randy
<br />Pape Beltline from Roosevelt
<br />to W 11th, intersection
<br />MM-20 improvements 20-yr $28,100,000 $7,500,000 $20,600,000 34% $6,923,236 $0 $6,923,236 25%
<br />Widen Barger Dr. to provide
<br />a second through lane in
<br />MM-21 each direction 20-yr $1,900,000 $700,000 $1,200,000 4% $48,336 $0 $48,336 3%
<br />Convert 8th Ave. to 2-way
<br />MM-22 street 20-yr $3,900,000 $1,800,000 $2,100,000 4% $87,027 $0 $87,027 2%