<br />CITY OF EUGENE
<br />TRANSPORTATION SDC PROJECT PLAN, 2018
<br />TSP
<br />No. Project Name
<br />258 Spyglass Accessway 20-yr $64,000 $0 $64,000 100% $64,000 $25,259 $38,741 61%
<br />259 Holly Ave. Accessway 20-yr $31,000 $0 $31,000 100% $31,000 $12,222 $18,778 61%
<br />472 E 25th Ave. Accessway 20-yr $9,000 $0 $9,000 100% $9,000 $0 $9,000 100%
<br />560 Wallis St. Path 20-yr $48,000 $0 $48,000 100% $48,000 $0 $48,000 100%
<br />Subtotal Accessways $810,000 $0 $810,000 $810,000 $37,481 $772,519
<br />Grade Separated
<br />12 Park Ave. Overpass 20-yr $4,110,000 $0 $4,110,000 100% $4,110,000 $0 $4,110,000 100%
<br />249 Amazon Dr. Footbridge 20-yr $75,000 $0 $75,000 100% $75,000 $33,176 $41,824 56%
<br />390 Jay St. Bridge 20-yr $125,000 $0 $125,000 100% $125,000 $0 $125,000 100%
<br />596 Grant St. 20-yr $900,000 $0 $900,000 100% $900,000 $0 $900,000 100%
<br />Amazon and 36th Dr.
<br />612 Footbridge 20-yr $75,000 $0 $75,000 100% $75,000 $33,176 $41,824 56%
<br />Amazon and Dillard
<br />613 Footbridge 20-yr $75,000 $0 $75,000 100% $75,000 $33,176 $41,824 56%
<br />Amazon and 34 Ave.
<br />th
<br />219
<br />Footbridge 20-yr $200,000 $0 $200,000 100% $200,000 $0 $200,000 100%
<br />Subtotal Grade Separated $5,560,000 $0 $5,560,000 $5,560,000 $99,528 $5,460,472
<br />
<br />
<br />
<br />June 13, 2018, Work Session - Item 1
<br />A-15
<br />
<br />
|