Laserfiche WebLink
<br />Minimi~tion of cOnflicts - Dust - addressed by DEQ. Emissions. standards applied by Lane Regional <br />Air Pollution Authority (LRAP A) through an Air Contaminant Discharge Pennit (ACDP): <br />Visible Air C~ntaminant Limitation (LRAPA 32-010) <br />Particylate Matter Weight Standards (LRAPA 32-615) <br />Particulate Matter Size '.Standard (LRAP A 32-055) <br />, Other Emiss.ions (LRAP A 3,2-090) <br />Rules for F~gitive Emissions (LRAP A 48-01 S) <br /> <br />This PAPA is for tbturemining of an adjacent expansion site. Delta's proceqing operation directiy <br />east of the expansion site operates under a currentL'RAPApermit (No. 20119). if approved,. the <br />proposed future mining exPansion area will. be. added to the existing permit and. complianCe <br />requirements' w~ll be updated to includ~ the expansio~ ~ and conduct operations ..ip a manner that <br />complies with the applicable standards under the existing authorized pennit. The existing operation is <br />not under review in this PAPA application. ' <br /> <br />. . . <br /> <br />The submittals from the SCRO mises issue with the dust impact analysis and with thetrustabUity of the <br />applicant to Died the LRAPA requirements. LRAP A past .violations are included in the Written record. <br />AdditioJially, some of thC neighboring. resideats have. health issu~. that are exacerbated by. poor . air <br />quality, asthma and breathing problems and have .-aised that issue. The analysis conducted by <br />Bridgewater models a conservative approach to the predicted conflict. The. Planning Commissions bad, ' <br />. conceniSabout lack of analysis of additional bnpacts from dust if the setback variance request to <br />complete a low permeability. baaier (~clude) WQ granted.. the location of the ~ and <br />. methodology for completion was considered to be a large factor in the d~ennination of impacts. for this <br />confliCt. See P A1238 Exlu'bit ~C'. ~nc!itions #13- #21 for dust minimization conditions ProPOsed by <br />, the' app.licant. . <br /> <br />. , <br /> <br />Both of the PlaDDlDg . Commissions fouod UD.nllllou~ly that there Is a eonftiet. due to duH, and <br />that'tlle eonftlet due to dust eould, "Dot be. mlnlml7~ 'to . I~vel. that meets 'the DEQ. emlulon <br />ltaD4ards..ppUed 1>>,. LRAP A.. Neither. plaDDlDgcoDmdsiioo condudect further ESU ...... <br />' b~1ile RODe. h~d beeD provided by the .ppDeant. .. . <br /> <br />.. LaneCoanty . PlaDDiDg ColDDIisiion voted 3-2 with ODe. abstention, ud Eugene, PlaDDiDg <br />'. CO~slOD votect,3-% that the conftlet eould Bot be mlnlml~~ ' <br /> <br />(. . <br /> <br />FLOODING CQNFLICl'S. '. . .. . <br />. The Lane County FloOd H8zard requirements are .found in. Lane Code 16.244 Floodplain Combining <br />, Zone. Refer to applicant's submittal Bvalll;8tion of Potential Flood Impact (Exht'bit II) The applicant <br />. . deicribes how all activity will be beiow ground and not affect the base flood level. Federal EmergenCy . <br />. Management. Agency' requirements as implemented by Lane County in Lane Code 16.244(7)(cXii): <br />CCWhere basejlootJ'f!levatio1Lf have been"provided butjloOdways have not" the cumulative effect of anY . <br />proposed deVelopment, when' combined, with all 'other existing' and anticipated development, shall hot <br />. increase, the wate" surface elevation of th:e hf:lse flood more than one foot at any point." . <br /> <br />. Gravel extraction activity does not impede floodwaters because extraction of the aggregate will <br />. proceed in a downward manner, and will not create any banier'sthat impede flood flows. Conflicting <br />testimony and photos submitted during the public hearing dispute that assertion. .R.esidents hi the <br />neighbOrhood submitted photos of flOo4ed streets (Exhibits 41 & 42)and provided testimony at the <br />Noveri1ber 15111 2005. Hearing expressing concern that 'mining. of the expansiooare& would exacerbate <br />',flooding in the 'Sutrounding 'n~igbborhoods, 'especially the new residential developments built withitt <br />the, ~act area. The relationship between groUndwater ~d sUrface water in af)ood and uncertainty of <br /> <br />B~Council Hearing- OJdinance No. PA. 1238', <br />Agenda Cover Memo <br /> <br />Deltt Sand &, Gravel Ex_on <br />